Laserfiche WebLink
Draft Environmental Impact Report Page II-7 <br /> Forward Inc. Landfill Expansion <br /> C.3. On-Site Landfill Mitigation Measure C.3. Three options exist to mitigate the project's potentially Less than <br /> Equipment Noise significant impact from equipment operations, as follows: Significant <br /> (a)Heavy equipment operations shall not be conducted within 1,500 feet of any <br /> occupied residence after 10 p.m. and before 7 a.m.; or <br /> (b) Equipment operations within 1,500 feet of any residence after 10 p.m.or before 7 <br /> a.m. shall be fully shielded from the direct line of sight to the residence by an earthen <br /> berm whose crown elevation exceeds the elevation of the top of the exhaust stack. <br /> C.4. Cumulative Noise Potentially Significant. No mitigation available Significant <br /> Impacts and <br /> Unmiti able <br /> D.AIR <br /> QUALITYIODORS <br /> Mitigation Measure D.1. The applicant shall comply with Regulation VIII Rule 8011 Less than <br /> D.1. Initial construction and implement the following control measures during construction: Significant <br /> particulate matter <br /> (PM10) and equipment • The applicant shall submit a Dust Control Plan subject to review and approval of <br /> exhaust emissions. the SJVAPCD at least 30 days prior to the start of any construction activity on a <br /> site that includes 40 acres or more of disturbed surface area. <br /> Specific control measures for construction,excavation, extraction, and other <br /> earthmoving activities required by the SJVAPCD include: <br /> • All disturbed areas, including storage piles not actively utilized for construction <br /> purposes, shall be effectively stabilized using water,chemical <br /> stabilizer/suppressant,or covered with a tarp or other suitable cover or <br /> vegetative ground cover in order to comply with Regulation VIII's 20 percent <br /> opacity limitation. <br /> • All onsite unpaved roads and offsite unpaved access roads shall be effectively <br /> stabilized using water or chemical stabilizer/suppressant. <br /> • All land clearing, grubbing, scraping,excavation, land leveling, grading, cut and <br /> fill, and demolition activities shall be effectively controlled utilizing application <br />