My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007861
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-0800105
>
SU0007861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 11:37:03 AM
Creation date
9/4/2019 10:03:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007861
PE
2675
FACILITY_NAME
PA-0800105
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
APN
20106003
ENTERED_DATE
8/11/2009 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
7/24/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR PA-0800105\NOP.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
687
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Environmental Impact Report Page II-13 <br /> Forward Inc. Landfill Expansion <br /> disposal area and not onto the flat compacted landfill surface. Bulldozers <br /> would then push soil cover onto the working face to cover the ACM bags <br /> and will not contact the bags. <br /> b. For Forward site employees engaged in handling asbestos materials, <br /> Forward will implement one of the following: <br /> 1. a three day approved asbestos workers training program <br /> 2. any asbestos training program specific to landfill employees <br /> that has been developed, described, or required by regulation <br /> by either the CIWMB or Cal-OSHA <br /> 3. any other asbestos training program approved by Cal-OSHA <br /> c. Provision of water at the working face to keep ACM damp until covered. <br /> • Continuation of the annual physical evaluations of all on-site Forward <br /> employees for asbestos exposure. <br /> • Workers would not be allowed to eat near the active landfill. <br /> No additional mitigation measures are required. <br /> E.2. Hazardous waste Proposed as Part of the Project: Less than <br /> might inadvertently be As part of the project, the following procedures are proposed to reduce this impact: Significant <br /> contained in the solid <br /> waste that is brought to • The Forward Landfill "load-checking program," which is designed to mitigate <br /> the landfill for disposal. against hazardous waste being placed in the landfill, will continue to be <br /> implemented for the consolidated landfill. <br /> • Landfill operators will be trained to recognize and properly segregate and <br /> handle hazardous waste. This will include a 24-hour hazardous- waste <br /> materials-management training program that complies with 29 CFR, Section <br /> 1910. <br /> No additional mitigation measures are required. <br /> J= ao. i '"k? ow k �fM '� tit am �U <br />
The URL can be used to link to this page
Your browser does not support the video tag.