Laserfiche WebLink
Draft Environmental Impact Report Page II-14 <br /> Forward Inc. Landfill Expansion <br /> E.3. Spills, collisions, Proposed as Part of the Project: Less than <br /> upsets, or other accidents • The Standard Safe Work Practices listed in the Forward, Inc. Site Health and Significant <br /> at the landfill or during Safety Program and Contingency Plan will be implemented by the operator. <br /> waste transport could <br /> cause injury to site • The landfill operator will comply with the provisions of CCR Title 27,Section <br /> workers, the general 20590,which requires that O&M personnel wear and use approved safety <br /> public,or the equipment for personal heath and safety. <br /> environment. <br /> • • Landfill access will continue to be controlled to limit unauthorized entry by <br /> persons or vehicles. <br /> • The landfill operator will comply with all provisions of CCR, Title 27,Division 2, <br /> Chapter 3, Subchapter 4, Articles 1'-3 that apply to landfill health and safety. <br /> Identified in This EIR: <br /> Mitigation Measure E.3. The San Joaquin County Public Works Department shall <br /> approve any new waste transport haul routes to the landfill from major arterials, SR 4, <br /> or Highway 99. <br /> E.4. Additional landfill Proposed as Part of the Project: Less than <br /> gas would be generated, • Where required by State and Federal regulations, the landfill gas monitoring, gas Significant <br /> thus increasing the control and collection system will be installed,extending to the new areas of the <br /> potential for explosion expanding landfill and operating in conformance with applicable regulations. <br /> hazards. <br /> • The existing gas extraction system, or an equivalent system, will continue to <br /> operate. <br /> • Regular gas monitoring will be conducted to prevent explosive or toxic gas <br /> accumulation in onsite buildings or beneath temporary buildings. The landfill <br /> operator will install an automatic combustible gas detection and alarm system <br /> for structures at the site. <br /> • The landfill operator will not construct or otherwise locate any structure in an <br /> area of known landfill gas build-up. <br />