Laserfiche WebLink
Draft Environmental Impact Report Page II-15 <br /> Forward Inc. Landfill Expansion <br /> All site personnel who work in permanent structures will be trained to use and <br /> respond to the landfill gas monitoring and alarm system. <br /> Identified in This EIR: <br /> Mitigation Measure EA: Landfill gas monitoring shall include the volatile organic <br /> compounds in order to determine the amount of contaminant recovery, and control <br /> potential exposure to on site personnel. <br /> E.S. Solid waste contains Proposed as Part of the Project. Less than <br /> pathogens that could • The landfill operator will follow legally required daily or alternative cover Significant <br /> spread by vectors. practices. <br /> • The landfill will continue to ban intact tires(which collect water and serve as a <br /> breeding ground for vectors) and large dead animals from disposal at the <br /> landfill. <br /> • Existing measures to discourage birds from the landfill will be continued. <br /> • Appropriate landfill personnel will periodically monitor the landfill for the <br /> presence of vectors, and landfill inspections will be documented in the landfill <br /> operations administrative file. <br /> E.6. The project would Identified in This EIR: Less than <br /> involve the use of Significant <br /> additional regulated or Mitigation Measure E.6: <br /> hazardous materials <br /> during the additional (a) All applicable regulatory guidance originating after the Forward Landfill 2002 EIR <br /> expansion construction shall be implemented;all hazardous materials shall be handled in accordance with local, <br /> phase and subsequent State,and federal regulations. <br /> operational phase (b)The site HMMP,SWPPP, Operations Manual, and Wet Weather Plan shall serve to <br /> proposed by the provide guidance in the use and handling of hazardous materials during the operations <br /> combined landfill. of the facility. <br /> W Aoo -aw imm "aw `. i `tit <" aw 00 � <br />