Laserfiche WebLink
.. h 1,,'�'r•" �;�"""�'I �!"'�"".�i ^..."..' 1 <'1'�r`..'4 .. _ ,.,tl' .�77 <br /> _ . l� . r <br /> Draft Environmental Impact Report Page II-22 <br /> Forward Inc. Landfill Expansion <br /> additional groundwater extraction. Mitigation measure F7 should be updated following <br /> the Water Board' review and approval. <br /> rF.8. Base grade Less than significant. None required. Less than <br /> modifications could Significant <br /> impact water quality. <br /> F.9. The combining and Identified in This EIR: Less than <br /> expansion of the Landfill Significant <br /> would result in the Mitigation Measure F.9: Replacement wells shall be installed to mitigate against the <br /> removal of existing loss of old wells.This shall be reviewed by the RWQCB. The RWQCB must approve the <br /> groundwater monitoring plans for the number and location of the new wells as part of their approval process, <br /> wells. which is separate from the EIR approval process. <br /> G. SOILS AND <br /> GEOLOGY <br /> G.1. Because soil on the Proposed as Part of the Project: Less than <br /> project site may be Significant <br /> inadequate—in quantity Additional cover material needed for alternative daily covers,approved by the <br /> or quality—to meet the CIWMB,will be imported from approved borrow material locations. <br /> demands of the daily, <br /> intermediate, and final No additional measures are required. <br /> cover over the duration <br /> of the project, soil may <br /> need to be imported. <br /> G.2. Seismic shaking Proposed as Part of the Project: Less than <br /> could impair or Significant <br /> otherwise compromise The project sponsor has prepared a seismicity study for the site, with details in <br /> both the existing and Appendix D of the Geotechnical Investigation Report(Geo-Logic,2008a, 2008b) <br /> proposed(for the new and the Geosyntec(1999)report. If the potential maximum peak ground <br /> expansion areas) Class II acceleration in the seismicity study is greater than that assumed in the <br /> liner and associated preliminary design,the final project design analysis will make modifications <br /> leachate collection needed to meet the factor of safety (determinations may be subject to the <br />