Laserfiche WebLink
Draft Environmental Impact Report Page IV.B-8 <br /> Forward Inc. Landfill Expansion <br /> Existing Plus Approved Projects <br /> This section of this traffic study describes conditions that would exist if traffic associated with <br /> previously approved projects in the vicinity of the proposed project that are likely to be <br /> constructed in the near term is added to existing traffic. <br /> Previously-Approved Projects <br /> County staff identified three nearby projects to include in the Approved Projects inventory. <br /> Trips generated by the following previously-approved projects were added to existing traffic <br /> volumes to develop EPAP conditions traffic volume estimates. <br /> • California Health Care Facility,located west of Austin Road between the Forward <br /> Landfill and Arch Road <br /> • Northern California Re-Entry Facility, located on the south side of Arch Road between <br /> Austin and Newcastle Roads <br /> • Arch Road Industrial Project,located on the south-side of Arch Road between Austin <br /> and Newcastle Roads,west of the Northern California Re-Entry Facility <br /> Estimated traffic volumes from those projects were obtained from the traffic studies completed <br /> for each facility. Table IV.B-5,below, provides the number of trips generated, and sources, for <br /> each of the previously approved projects. <br /> Table IV.B-5 <br /> TRIP GENERATION FOR APPROVED PROJECTS <br /> Project Trips <br /> Approved Project Daily Trips AM Peak Hour PM Peak Hour <br /> In OutIn Out <br /> California Health Care Facility' 3,566 452 40 40 393 <br /> Northern California Re-Entry Facility 1,920 85 80 35 44 <br /> Arch Road Industrial Project' 764 50 26 12 30 <br /> s Notes: <br /> 'Source:California Health Care Facility Stockton EIR(DKS Associates 2008)Page 4.3-18,Table 4.3-13 <br /> Source:Northern California Women's Facility Conversion to Northern California Re-Entry Facility, Initial <br /> n StudylMitigated Negative Declaration (DKS Associates 2008)Page 14,Table 7 <br /> 'Source:Transportation Impact Analysis Arch Road Industrial Development(Fehr&Peers 2008)Page 19, <br /> Table 10 <br /> Traffic Volumes <br /> AM and PM peak hour traffic volumes at the study intersections under EPAP conditions are <br /> shown in Figure IV.B-3. <br /> E; <br /> Intersection Operations <br /> Intersection operations during the AM and PM peak hours under EPAP conditions were <br /> analyzed for this traffic study. AM and PM peak hour traffic volumes at the study intersections <br /> under EPAP conditions are shown in Figure IV.B-3. Levels of service that would occur at the <br /> study intersections are presented in Table IV.B-6. Under EPAP conditions, LOS would decrease <br /> ff .. <br />