My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007861
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-0800105
>
SU0007861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 11:37:03 AM
Creation date
9/4/2019 10:03:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007861
PE
2675
FACILITY_NAME
PA-0800105
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
APN
20106003
ENTERED_DATE
8/11/2009 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
7/24/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR PA-0800105\NOP.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
687
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Environmental Impact Repo Page V-5 <br /> P P g <br /> Forward Landfill Expansion <br /> Table V-1 <br /> Summary of Proposed NCRCSL Permit Revisions <br /> Permit Condition Previous Limit Revised Limit <br /> Maximum fill elevation(1) 190 ft MSL 320 ft MSL <br /> Peak Daily Refuse Disposal 825 tons per day 1200 tons per day <br /> Maximum Incoming refuse 600 per day 850 per day <br /> vehicles <br /> Operating Hours (during which <br /> refuse may be received at the 7:00 AM to 5:00 PM No Change <br /> facility) <br /> Use of heavy equipment for the 7:00 AM to 7:00 PM <br /> disposal and cover of received (per the 1990 EIR). 6:30 AM to 7:00 PM. (2) <br /> refuse (noise impact) <br /> Notes <br /> 1. Increased landfill height requires revision of final grading plan,volumetric capacity and site life <br /> (see Preliminary Closure and Postclosure Maintenance Plan) <br /> . 2. To the fullest extent possible, maintenance of the facility that requires the use of heavy equipment <br /> outdoors will be performed during this time. Some activities, such as the installation of new liners <br /> below existing grade,will provide shielding due to their location,and can be performed at other <br /> times (See Final EIR Page 3-2 et seq for clarifications of site use. <br /> 3. MSL= Mean Sea Level <br />
The URL can be used to link to this page
Your browser does not support the video tag.