Laserfiche WebLink
` Draft Supplemental Environmental Impact Report Page III-5 <br /> Forward Inc. Landfill 2014 Expansion Project <br /> • Increase the remaining landfill capacity by approximately 32.0 million cubic yards (cy) <br /> to approximately 54.0 million cy. All of the increase would be Class II landfill space and <br /> would extend the landfill closure date to approximately 2039.' <br /> • Relocate approximately 3,000 feet of the South Fork of South Littlejohns Creek(which <br /> currently traverses the landfill) to the southeastern boundaries of the site to provide <br /> additional separation of the creek from the landfill. The relocated creek will be <br /> approximately 3,200 feet in length. <br /> • Allow cannery waste processing in areas of site that are not being used for disposal at <br /> the time. <br /> This prior expansion project would have allowed landfilling activities within 10,000 of the <br /> Stockton Metropolitan Airport, and required a four-fifths vote of the Board of Supervisors to <br /> i 60 override the County Airport Land Use Commission finding that this proposed expansion <br /> project was not in conformity with the 1993 San Joaquin County Airport Land Use Plan. This <br /> former project failed to achieve the required vote. However, the Board of Supervisors certified <br /> the Forward Landfill Expansion Final Environmental Impact Report (San Joaquin County, May 2013) <br /> to- ("FEIR") in compliance with the California Environmental Quality Act (CEQA). <br /> The 2014 Expansion Project described in this Supplemental EIR is a smaller increase in <br /> permitted landfilling capacity that does not include the previously proposed horizontal <br /> expansion of landfilling operations on the 184-acre Brocchini parcel.The additional proposed <br /> landfill acreage is entirely within the boundary of the 567-acres permitted under the current <br /> bin land use permit(UP-00-0007/ER-00-0002) approved by the Board of Supervisors on April 8, <br /> 2003. The 2014 Expansion Project would not entail putrescible waste (waste streams other than <br /> concrete,rock, asphalt,wood and yard waste)in the Outer Approach and Climbout Areas of <br /> the Stockton Metropolitan Airport,expansion of landfilling operations to within 10,000 feet of <br /> ■- the end of the runway of the Stockton Metropolitan Airport, or expansion of landfilling <br /> operations on to any parcels of land under Williamson Act contract. <br /> ` The 2014 Expansion Project would make the following changes: <br /> • Allow the construction of landfill disposal cells and landfilling operations within those cells <br /> on an 8.7-acre portion of the 10-acre parcel(described in the 2013 EIR)that lies in the <br /> northeast portion of the site within the currently permitted landfill boundary. (The <br /> remaining 1.3 acres of the 10-acre parcel is occupied by a landfill gas-to-energy plant and is <br /> not proposed for landfill.) In addition,approximately 6.2 acres of landfill disposal area is <br /> proposed to be added to the currently permitted landfill footprint in the south area by <br /> shifting the existing disposal footprint to the north and realigning the South Fork of South <br /> Littlejohns Creek to the southern and eastern boundary of the site(see Figures IH.0-4 and <br /> IH.0-5).In the south,a total of 30.0 acres would be filled under the 2014 Expansion Project, <br /> consisting of 23.8 acres previously permitted for disposal plus 6.2 acres of additional <br /> 'The 2013 FEIR estimated closure dates with and without that project of 2039 and 2021,respectively. <br /> However,2014 estimated closure dates with and without the 2012(previously proposed)project are 2045 <br /> and 2026,respectively. <br />