Laserfiche WebLink
Page 1 I <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURE LEVEL OF <br /> SIGNIFICANCE <br /> AFTER <br /> MITIGATION <br /> shall be installed when warranted. The <br /> ' landfill's share of traffic contributed to the <br /> intersection should be used to calculate the <br /> Landfill's share of cost <br /> D.2 The project would contribute to the Please see Mitigation Measure D.1. This LS <br /> cumulative impact of a deterioration of mitigation measure would also mitigate the <br /> level of service at the Austin Rd/Mari sa g <br /> Rd/Mariposa project's contribution to cumulative traffic <br /> Fli Rd intersection. (SIGNIFICANT) impacts. <br /> D.3 The project could result in slightly None Required LS <br /> accelerated pavement deterioration on <br /> study area roadways, (LESS THAN >, <br /> SIGNIFICANT). <br /> 3 D.4 The _ + <br /> project could result in slightly None Required LS <br /> increased traffic safety hazards on study m <br /> area roadways, (LESS THAN <br /> F; SIGNIFICANT) n <br /> E. CULTURAL RESOURCES <br /> I <br /> E.I The Austin Road Landfill Expansion (a) If prehistoric archaeological resources LS <br /> area,with the Nor *ranch of South Fork are discovered during excavation and <br /> of Little Johns Creek running through it,is construction of the proposed project,the <br /> a potential candidate for locating additional project sponsor shall suspend all work in <br /> and/or disturbing subsurface cultural the immediate vicinity of the find pending <br /> deposits. (SIGNIFICANT) site investigation by a qualified <br /> F archaeologist or cultural resources <br /> consultant to assess the materials and <br /> determine their significance. <br /> (b) The project sponsor shall allow only a s <br /> qualified archaeologist or cultural <br /> S resources consultant to collect any <br /> prehistoric cultural resources discovered <br /> on the site. t <br /> + ' (c)If prehistoric archaeological deposits <br /> that include human remains are discovered <br /> Ft <br /> by the project sponsor or any construction <br /> contractors during development of the <br /> project corridor,the project sponsor shall <br /> notify the County Coroner immediately. If <br /> the remains are found to be Native <br /> American,the Native American Heritage k <br /> I <br /> FF GRASS=ENVIRONMENTAL CONSULTING J <br /> i <br />