Laserfiche WebLink
Page 12 <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURE LEVEL OF <br /> SIGNIFICANCE <br /> AFTER 9 � <br /> MITIGATION f <br /> Commission must be notified within 24 �+ <br /> hours. <br /> (d)If avoidance of important prehistoric <br /> archaeological resources would not be i <br /> feasible,the project sponsor shall prepare <br /> an excavation plan in coordination with a <br /> qualified archaeologist or cultural <br /> resources consultant. <br /> F. VEGETATION AND WILDLIFE <br /> F.1. Implementation of the proposed (a)The Wetland Mitigation and LS <br /> project would fill and relocate Monitoring Plan for the Austin Road <br /> approximately 4.5 acres of the North Landfill Expansion(Jones and Stokes, <br /> Branch of the South Fork of Little Johns 1996)will be implemented as part of the <br /> Creek including 2.895 acnes of Corps- proposed project,consistent with the terms <br /> verified jurisdictional wetlands within the and conditions of the Section 404 Permit <br /> 4.5-acre channel. (SIGNIFICANT) issued by the U.S. Army Corps of <br /> Engineers. The pian and permit post-date <br /> preparation of the 1994 EIR. The plan <br /> provides for <br /> • realigning 7,600 linear feet of the <br /> North Branch of the South Fork of <br /> Little Johns Creek,between the <br /> northeastern and southwestern project <br /> boundaries,with a new 7,800-foot <br /> long channel along the northern and <br /> western project boundaries; <br /> • creation of approximately 7.0 acres of <br /> watercourse that is allowed to freely 'LJ <br /> meander within a 200-foot wide <br /> floodplain; <br /> • Planting of 39.4 acres of riparian <br /> habitat; <br /> • Monitoring and maintenance for five <br /> years following construction. <br /> (b)In addition,a 4.3-acre detention basin <br /> will be constructed in the southwest corner <br /> of the project site,as depicted on project <br /> plans(FW. Beck and Associates, 1993). <br /> GR4SYET7I ENVIRONMENTAL CONSULTING " <br />