Laserfiche WebLink
f <br /> Page 13 - F <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURE LEVEL OF, 3 <br /> F SIGNIFICANCE <br /> p AFTER <br /> MITIGATION <br /> ' F-2 Implementation of the proposed project , (a)Under current project plans,31 of the LS b <br /> could remove up to thirty-two valley oaks, 32 valley oaks are along the perimeter of averaging approximately thirty inches dbh. the site or are in the designated wildlife <br /> (SIGNIFICANT) preserve adjacent to the creek and would <br /> not be removed: ' <br /> (b)Prior to initiation of any activity within <br /> a I00-foot radius of a valley oak proposed <br /> for retention,the project proponent shall <br /> f <br /> install clearly visible temporary fencing <br /> �.. around the dripline of the Valley oak to <br /> prevent inadvertent damage during on-site <br /> activities. Fencing shall be removed upon <br /> :completion of activity within the oak's <br /> vicinity. Site workers shall be advised of <br /> the sensitivity of on-site oaks to <br /> disturbance. <br /> i <br /> (c)Where avoidance of a valley oak(s) as <br /> specified above is determined infeasible, <br /> the project proponent shall replace each <br /> oak as required by the County's Natural <br /> } .Resources Regulations: three oaks shall be <br /> planted in appropriate locations for each <br /> oak removed. Replacement trees shall be <br /> the same species as the removed trees. <br /> Replacement trees shall be planted on the <br /> site in association with the Wetland <br /> Mitigation and Monitoring Plan described <br /> under Mitigation Measures F.I(b). <br /> k 4 <br /> (d)To ensure the success of mitigation, <br /> planted and retained trees shall be <br /> monitored for a period of five years <br /> following initial disturbance within the <br /> vicinity of a retained tree or following <br /> planting of a replacement tree. If,during <br /> the course of monitoring,a significant <br /> decline in the health of planted or retained <br /> r trees is identified by a qualified arborist, <br /> the tree shall be replaced as described <br /> ` under(c),above. <br /> F.3. Implementation of the proposed (a) Under current project plans, E <br /> project would,over the approximately 40- approximately 10.3 acres of the Brocchini <br /> year 'ect life displace 80.5 acres of - propertv and the 6.5-acre trianlar ' <br /> F GRASSETTI EAWRO <br /> NMENT,4L CONSULTING <br /> F1 <br />