Laserfiche WebLink
Page 19 s <br /> i ENVIRONMENTAL,IMPACT MITIGATION MEASURE LEVEL OF <br /> SIGNIFICANCE <br /> AFTER <br /> MITIGATION <br /> -If onsite wetlands,irrigation ditches, <br /> marshes,etc. are being relocated in the <br /> vicinity: the newly created aquatic habitat <br /> shall be created and filled with water <br /> prior to dewatering and destroying the <br /> pre-existing aquatic <br /> habitat. In addition,non-predatory fish <br /> I species that exist in the aquatic habitat <br /> and which are to be relocated shall be <br /> seined and transported to the new aquatic <br /> t habitat as the old site� te�sd <br /> ewa r <br /> . to ed. <br /> R 13. Any construction activities (a)Prior to initiating any work in the North LS <br /> conducted in or near the North Branch of Branch of the South Fork of Little Johns <br /> the South Fork of Little Johns Creek could Creek and adjacent habitats,pre- <br /> result in significant adverse impacts to construction surveys should be conducted <br /> western pond turtles. (POTENTIALLY ., within 48 hours prior to de-watering the s <br /> SIGNIFICANT) creek channel. CDFG and USFWS should <br /> be consulted for guidance prior to any <br /> western pond turtle translocation work. <br /> Translocation should be conducted with <br /> the approvals of USFWS and CDFG. In <br /> addition; a detected nest would require a <br /> 300-foot buffer area for the nest and the <br /> associated wetlands while the nest is <br /> occupied. The nest site should be F <br /> monitored by a qualified biologist until the <br /> hatchlings have left the nest. These <br /> buffers shall be indicated by temporary <br /> t <br /> ° fencing if construction has begun or will <br /> begin before nesting periods have ended <br /> (the period from egg laying to emergence <br /> of hatchlings is normally April to <br /> November).Furthermore, any pre- <br /> construction and construction measures <br /> should be consistent the SJMSCP. <br /> F.14. Implementation of thePproject could (a Pre <br /> -construcnon surveys for greater LS <br /> result in significant adverse impacts to western mastiff bat should be conducted <br /> 4 greater western mastiff bat prior to removing any trees from the <br /> (POTENTIALLY SIGNIFICANT) project site. These pre-construction <br /> surveys may be required and funded by the <br /> SJMSCP JPA and should be conducted by <br /> a biologist with experience surveying for <br /> bats and the surve s should not occur an <br /> GRASSETTI ENVIRONMENTAL CONSULTING <br /> x <br />