Laserfiche WebLink
Page 20 <br /> ENVIRONMENTAL.IMPACT MITIGATION MEASURE LEL OF <br /> 1� <br /> SIG�iIFICANCE <br /> AFTER <br /> MITIGATION <br /> more than 30 days prior to the proposed <br /> tree removal. If no special-status bats are <br /> identified during the pre-construction <br /> survey(s),then no impacts to these bats <br /> would be expected to occur from <br /> construction of the proposed project. If, <br /> however,greater western mastiff bat is <br /> identified in any of the trees proposed for <br /> removal,reproductive status should be <br /> determined. <br /> (b) Maternity sites should be avoided until <br /> bats finish'rearing young. Prior to the bats <br /> finishing rearing their young,bat <br /> roosts/maternal"bat houses"should be <br /> placed within a protected area in the <br /> vicinity of the roosting/maternity sites if <br /> possible. As soon as young are flying and <br /> foraging,the maternity sites should be <br /> sealed. Similarly,once bat houses are <br /> installed in protected areas,bats should be <br /> evicted from their roost sites within the <br /> project construction zone(i.e.,should be <br /> evicted from the trees to be removed). <br /> Removal of roost sites should occur during <br /> dusk or evening after bats have left the <br /> sites unless otherwise approved. These <br /> measures are consistent with the SJMSCP. <br /> (c) Pre-construction surveys would <br /> prevent direct take of individuals or <br /> maternity sites. No immediate <br /> replacement of roosting habitat has been <br /> proposed. If a maternity roost or occupied <br /> roost is detected during pre-construction <br /> surveys,the SJMSCP JPA shall provide <br /> adequate replacement for loss of occupied <br /> habitat should be designed and <br /> implemented with input from CDFG. <br /> Implementation of these mitigation <br /> measures would reduce impacts to levels r 1 <br /> considered less than significant. Pli� <br /> F.15. Implementation of the project could (a)The project sponsors or the SJMSCP LS <br /> result in significant adverse impacts to JPA should fund and conduct pre- <br /> burrowing owls if burrowing owls are construction protocol surveys for burrowing <br /> GRA <br /> SSETTI ENVIRONMENTAL CONSULTING <br />