My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012793
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
EIR-99-2
>
SU0012793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 12:22:48 PM
Creation date
9/4/2019 10:03:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012793
PE
2675
FACILITY_NAME
EIR-99-2
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106005
ENTERED_DATE
1/6/2020 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR-99-2\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following mitigation measures will mitigate these impacts to below a level of significance. <br /> Mitigation Measures (Impact G.1): <br /> (a) Water the working face, excavation area, storage pile, unpaved roads, and all <br /> unvegetated soil areas frequently, adding a dust palliative(a non-toxic chemical <br /> suppressant, such as magnesium chloride (MgCl2) that attracts water molecules from the <br /> air), thereby keeping the surface wet for a longer period. Regarding the watering of the <br /> working face, a balance must be made between dust control and the generation of <br /> additional leachate. The landfill operator shall monitor dust levels and levels of leachate <br /> generated to determine when and where water should be applied. <br /> (b) The project sponsor shall seek to minimize the extent of areas exposed to wind <br /> erosion. Exposed surfaces, including stockpiles and other bulk materials with the <br /> potential to emit dust shall be stabilized with the application of water, chemicals, <br /> covered, or vegetated to the extent possible in accordance with the SJVUAPCD's <br /> Regulation 8030. On windy days, when dust plumes are present, active faces shall be <br /> watered down. <br /> (c) Plan and phase construction and closure operations such that they do not take place <br /> simultaneously on dry windy days. Schedule dusty activities on separate days. <br /> (d) Design the site ftllingplan to facilitate screening of the active face from prevailing <br /> winds, whenever possible, to minimize the amount of wind blown dust releasedPram the f <br /> working face. <br /> I <br /> (e) Haul trucks carrying airborne material shall be covered during transport and sprayed <br /> with water prior to dumping if it is shown that this would reduce dust emissions during <br /> off-loading activities within the landfill. <br /> a <br /> (f) The landfill operator shall restrict truck and equipment travel over loose, <br /> uncompacted unpaved surfaces. <br /> (g) Vehicle speeds on the project site shall be limited to 15 MPH. The main access road <br /> would be paved and maintained sufficiently to effectively y eliminate entrainment of visible <br /> dust emissions from vehicle travel in accordance with SJVUAPCD Rule 8040(control of <br /> fine particulate matter(PM10)from landfill disposal sites and Rule 8060(control of fine <br /> particulate matter(PM10)from paved and unpaved roads). <br /> Facts in Support of the Finding: <br /> The potential for generation of fugitive dust is discussed in Section IILG of the EIR. The <br /> measures above are designed to mitigate impacts of fugitive dust. <br /> 38 <br /> U. <br />
The URL can be used to link to this page
Your browser does not support the video tag.