Laserfiche WebLink
IMPACTIMITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMINGISCHEDULE TIMING <br /> A. LAND USE,PLANS,AND POLICIES <br /> A.1. The proposed project would introduce Please refer to the Please refer to the <br /> additional landfill uses to an area characterized by implementation monitoring/reporting responsibility Cl <br /> existing landfill uses,agricultural uses,detention responsibility and and timing identified in the Noise, <br /> center uses,limited residential uses and airport timing/schedule identified in Air Quality and Visual Sections of <br /> uses. Implement feasible mitigations to the the Noise, Air Quality and this EIR <br /> significant impacts identified in the Noise,Air Visual sections of this EIR. <br /> Quality and Visual sections of this EIR. <br /> A.2 The proposed project would convert None available. NIA <br /> prime agricultural land to industrial use. <br /> A.3 The proposed project would expand <br /> landfill activities within 10,000 feet of a SMA <br /> runway. <br /> (a) The project sponsor shall request FAA, (a)The Operator shall (a)Prior to start of construction <br /> CIWMB,and LEA review of the proposed project request FAA, CIWMB and SJCCDD shall verify that the FAA, <br /> and, specifically,bird abatement programs. The LEA review of the proposed CIWMB and the SMA have <br /> SMA shall also be notified. The project sponsor project and bird abatement reviewed the proposed project and <br /> shall abide by any additional reasonable and programs. Operator will that reasonable and feasible <br /> feasible measures designated by this agency to implement any additional mitigation measures recommended <br /> mitigate bird population impacts that could be reasonable and feasible by the reviewers are implemented. <br /> caused by the proposed project. mitigation measures <br /> recommended by the <br /> reviewers. <br /> (b) The project sponsor shall conduct a bird survey (b)Prior to the start of (b)Operator shall be on the lookout <br /> before construction of the project and monitor bird construction on the project, for increased bird populations <br />