Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> population after operation of the landfill expansion Operator in consultation during site visits. Any increased <br /> begins. The bird monitoring will be part of the with a qualified biologist bird populations will be reported to <br /> Wildlife Hazard Management Plan. If follow-up shall conduct a bird survey the SJCCDD who will implement <br /> survey shows an increase in bird populations, of the existing landfill.�, appropriate actions. SJCCDD will <br /> increase mitigation measures such as covering the follow-up survey shall be have an annual bird survey <br /> fill areas as soon as possible and using noise- conducted annually or when conducted and the results shall be <br /> 7RN7::7T77 <br /> I <br /> RESPONSIBILITY <br /> makers and other measures as necessary to there appears to be an recorded. SJCCDD shall file copies <br /> discourage birds from the site until bird population increase in the bird of the bird surveys with the FAA, <br /> levels return to the level found in pre-expansion population at the landfill. If SMA and the California Dept. of <br /> surveys. necessary SJCCDD will Transportation-Division of <br /> increase mitigation Aeronautics. <br /> measures. The bird monitoring will be <br /> included as part of the Wildlife <br /> Hazard Management Plan. <br /> (c) As required by California Code of Regulations (c)Operator shall notify the (c)Prior to the start of construction <br /> 172 5 8.1 0(b),Airport Safety,the owner or operators FAA and SMA of the work on the landfill expansion, <br /> proposing to site new MSWF units and lateral proposed project and SJCCDD shall verify that the FAA <br /> expansions within a five-mile radius of any airport construction timetable. and SMA have been notified of the <br /> runway end used by turbojet or piston-type aircraft Operator shall place in the proposed expansion project. After <br /> must notify the affected airport and the FAA. The operating record written each bird survey,the Operator shall <br /> results of Mitigation Measures(a) and(c)will be documentation of the results insert in the operating record the <br /> written in the format of a demonstration. of implementing Mitigation written results of implementing <br /> Measures(a)and(c). Mitigation Measures(a)and(c). <br /> (d) As required by California Code of Regulations (d)Operator shall place (d)Operator shall notify the <br /> 1725 8.1 0(c),Airport Safety,the owner or operator written demonstration in the CTWMB that the written <br /> must place the demonstration in the operating operating record that the demonstration has been placed in <br /> record and notify the CIWMB that it has been landfill expansion is the operating record which shows <br /> placed in the operating record. designed and operated so that the landfill expansion is <br /> that the landfill does not designed and operated so that the <br /> pose a bird hazard to landfill does not pose a bird hazard <br /> aircraft. to aircraft. <br /> 3 <br />