Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMINGISCHEDULE TIMING <br /> additional sources of light and glare in the project <br /> site. <br /> (a) A 6-foot chain link fence or other fencing (a) SJCCDD staff shall (a) SJCCDD shall review the <br /> approved by the County would be constructed at the require the installation of a construction of the landfill <br /> perimeter of the facility so that public access(and 6-foot high perimeter fence expansion to insure that the <br /> access to these views)would be limited. or other fencing approved by required perimeter fence is <br /> the County on the constructed. <br /> construction drawings for <br /> landfill expansion. <br /> (b) The facility would continue to operate only (b) SJCCDD staff will (b) SJCCDD shall monitor the <br /> during daylight hours so that excessive amounts of inform the landfill contractor operation of the landfill for any <br /> light would not be generated by the project. that his hours of operation violations of the standard operating <br /> will remain as currently hours. <br /> established. <br /> (c) The use of highly reflective surface materials in (c)Operator shall specify (c)SJCCDD shall verify during <br /> constructing structures on the site shall be that the exteriors of all field visits that the exteriors of all <br /> restricted. Exterior building materials shall be buildings shall be painted or buildings are painted or otherwise <br /> painted or otherwise treated with muted earthtone otherwise treated with muted treated with muted earthtones. <br /> colors. carthtones. <br /> (d) At any time in the development of the expanded (d)Operator shall review (d) SJCCDD shall verify that <br /> landfill when additional lighting is proposed, preliminary plans with the preliminary plans for any additional <br /> preliminary lighting designs should be sent to the Northern California lighting has been reviewed with the <br /> Northern California Women's Facility for review Women's Facility when Northern California Women's <br /> and comments. additional lighting is Facility prior to the installation of <br /> proposed. same. SJCCDD sliall verify that <br /> any plans for additional lighting are <br /> properly implemented. <br /> (e)The Stockton Airport management shall be (e) Operator shall provide (e) Prior to implementation of site <br /> provided with project lighting plans for review and Stockton Airport Director lighting. <br /> 7 <br />