Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORINGIREPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> comment. Modifications to the lighting plan shall with lighting plans. <br /> be made as necessary to avoid conflicts with airport <br /> operations. <br /> 13.4 The proposed project would extend the <br /> number of years of landfill operations and therefore <br /> extend the number of years for the potential of <br /> debris and Iitter along access roads and at the site <br /> during transporting and handling of material. <br /> (a) Refuse would be compacted and covered as (a)LEA will direct operator (a)LEA would verify through <br /> soon as possible after disposition to reduce amounts to compact and cover refuse periodic site visits that proper <br /> of blowing litter. as soon as possible after compaction and cover procedures <br /> placement of same. are being followed. <br /> (b) Portable litter control fences would be (b)LEA will instruct the (b)LEA will verify through <br /> strategically placed to reduce the amount of operator to install portable periodic site visits that portable <br /> blowing litter. litter fences to reduce the litter fences have been installed to <br /> amount of blowing litter. control blowing litter. <br /> (c) The working face would be oriented to the (c)LEA staff shall instruct (c)LEA will verify through <br /> downward side of prevailing winds to help reduce the operator to orient the periodic site visits that the operator <br /> litter. working face to the has oriented the working face to the <br /> downward side of prevailing downward side of prevailing winds <br /> winds to help reduce litter. to help reduce litter. <br /> (d) Periodic inspections would be conducted to (d)LEA will direct the (d)LEA shall verify through field <br /> collect and contain litter on- and off-site. operator to continue his visits that on-and off-site litter is <br /> routine collection of on-and being collected on a routine basis. <br /> off-site litter <br /> 13.5 Excavating,moving,and depositing <br /> soil for daily cover could create excessive dust and <br /> haze in the vicinity of the project. <br /> C <br />