Laserfiche WebLink
L%IPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> District. <br /> (e) Monitorthe rate of additional fire protection (e) LEA,Collegeville Fire (e) LEA to monitor ongoing <br /> and emergency service calls per year associated District,and landfill operator through project lifetime. <br /> with the proposed project. As warranted by the shall monitor and record all <br /> monitoring data, provide additional funding or fire protection and <br /> equipment(funded by the project sponsor or San emergency response calls <br /> Joaquin County). regarding the landfill. If <br /> necessary,the operator <br /> and/or County shall provide <br /> the District with any <br /> additional funding necessary <br /> to provide adequate service <br /> to the facility. <br /> D. TRANSPORTATION AND CIRCULATION <br /> D.1 The Austin Rd/Mariposa Rd <br /> intersection would operate at unacceptable LOS <br /> "F" during the AM peak hour. <br /> (a) To mitigate the substandard operating condition (a) PW shall require that the (a)PW shall verify that the landfill <br /> under project and cumulative conditions the landfill Iandfill owner contribute its owner has contributed its share of <br /> owner shall pay a fair share contribution to County appropriate share of the cost the cost signalizing the Austin <br /> for the installation of traffic signals at the Austin of providing signalization at Rd/Mariposa Rd intersection when <br /> Rd/Mariposa Rd intersection. The signals shall be the Austin Rd/Mariposa Rd warranted. <br /> installed when warranted. The landfill's share of intersection when warranted. <br /> traffic contributed to the intersection should be used <br /> to calculate the Landfill's share of cost. This <br /> contribution shal I not exceed 5%of the total cost of <br /> signal installation. <br /> 6 <br />