Laserfiche WebLink
_. <br /> IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> D.2 The project would contribute to the <br /> cumulative impact of a deterioration of level of <br /> service at the Austin Rd/Mariposa Rd intersection. <br /> Please see Mitigation Measure D.1. This Please see implementation Please see monitoring/reporting <br /> mitigation measure would also mitigate the responsibility and responsibility and timing for <br /> project's contribution to cumulative traffic impacts. timing/schedule for Mitigation Measure D.I. , <br /> Mitigation Measure D.1. <br /> D.3 The project could result in accelerated NIA <br /> pavement deterioration on study area roadways. No " <br /> mitigation measure is warranted. <br /> DA The project could result in increased NIA <br /> traffic safety hazards on study area roadways. No <br /> mitigation measure is warranted <br /> E. CULTURAL RESOURCES <br /> E.l The Austin Road Landfill Expansion <br /> area,with the North Branch of South Fork of Little <br /> Johns Creek running through it, is a potential <br /> candidate for locating additional and/or disturbing <br /> subsurface cultural deposits. <br /> (a) If prehistoric archaeological resources are (a) SJCCDD staff in (a)SJCCDD shall ensure the safety <br /> discovered during excavation and construction of consultation with the of any prehistoric archaeological <br /> the proposed project,the project sponsor shall Secretary of the Cultural resources discovered. <br /> suspend all work in the immediate vicinity of the Heritage Board shall monitor <br /> find pending site investigation by a qualified the excavation and <br /> archaeologist or cultural resources consultant to construction of the landfill <br /> assess the materials and determine their expansion. If prehistoric <br /> significance. archaeological resources are <br /> discovered,the operator and <br /> 17 <br />