My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012793
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
EIR-99-2
>
SU0012793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 12:22:48 PM
Creation date
9/4/2019 10:03:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012793
PE
2675
FACILITY_NAME
EIR-99-2
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106005
ENTERED_DATE
1/6/2020 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR-99-2\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> U.S. Army Corps of Engineers.The plan and permit consistent with the terms and been implemented consistent with <br /> post-date preparation of the 1994 DEIR. The plan conditions of the Section the terms and conditions of the <br /> provides for: 404 Permit issued by the Section 404 Permit issued by the <br /> U.S. Army Corps of U.S. Army Corps of Engineers. <br /> • realigning 7,500 linear feet of the North Branch Engineers. <br /> of the South Fork of Little Johns Creek, <br /> between the northeastern and southwestern <br /> project boundaries,with a new 7,800-foot long ' <br /> channel along the northern and western project <br /> boundaries; <br /> • creation of approximately 7.0 acres of <br /> watercourse that is allowed to freely meander <br /> within a 200-foot wide floodplain; <br /> • Planting of 39.4 acres of riparian habitat; <br /> • Monitoring and maintenance for five years <br /> following construction. <br /> (b) A 4.3-acre detention basin will be constructed (b) SJCCDD shall require (b) SJCCDD shall monitor the <br /> in the southwest corner of the project site,as that the detention basin is construction of the detention basin, <br /> depicted on project plans(R.W. Beck and constructed,consistent with and verily that it has been <br /> Associates, 1993). project plans. implemented consistent with <br /> project plans. <br /> (c) Restoration of the riparian area shall include (c)Applicant to implement. (c) SJCCDD shall monitor <br /> revegetation with trees, shrubs,and grasses native Timing is as described in the throughout project life. <br /> to the area. Plantings shall have a minimum 80% measure. <br /> survival after the first year,and 100%survival <br /> thereafter;or shall have attained a 75%cover after <br /> three years and a 90%cover after five years. <br /> Plantings shall be monitored each year and <br />
The URL can be used to link to this page
Your browser does not support the video tag.