Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> maintained as necessary until success criteria have <br /> been met. In order to assure implementation,the <br /> Wetlands Mitigation and Monitoring Plan shall be <br /> modified to include these criteria. <br /> F.2 Implementation of the proposed project <br /> could remove up to thirty-two valley oaks, <br /> averaging approximately thirty inches dbh. <br /> (a) Under current project plans,31 of the 32 valley (a) SJCCDD shall require (a) SJCCDD shall monitor <br /> oaks are along the perimeter of the site or are in the that 31 of the 32 valley oaks construction and verify require that <br /> designated wildlife preserve adjacent to the creek are not removed. 31 of the 32 valley oaks are not <br /> and would not be removed. removed. <br /> (b) Prior to initiation of any activity within a 100- (b) SJCCDD shall advise the (b) SJCCDD shall monitor <br /> foot radius of a valley oak proposed for retention, operator to install fencing construction and verify require that <br /> the project proponent shall instal I clearly visible around valley oaks and fencing is installed as required. <br /> temporary fencing around the dripline of the Valley instruct workers about the <br /> oak to prevent inadvertent damage during on-site sensitivity of the oaks to <br /> activities.Fencing shall be removed upon disturbance. <br /> completion of activity within the oak's vicinity. Site <br /> workers shall be advised of the sensitivity of on-site: <br /> oaks to disturbance. <br /> (c) Where avoidance of a valley oak(s)as specified (c)SJCCDD shall advise the (c)SJCCDD shall monitor j. <br /> above is determined infeasible,the project operator to replace oaks as construction and verify require that <br /> proponent shall replace each oak as required by the specified in Mitigation replacement of oaks is performed as <br /> County's Natural Resources Regulations:three oaks Measure F.2(c), specified in Mitigation Measure <br /> shall be planted in appropriate locations for each F.2(c). <br /> oak removed.Replacement trees shall be the same <br /> species as the removed trees. Replacement trees <br /> shall be planted on the site in association with the <br /> Wetland Mitigation and Monitoring Plan described <br /> under Mitigation Measures F.I(b). <br /> 21 <br />