Laserfiche WebLink
IMPACT/NIITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> (d) To ensure the success of mitigation,planted and (d) SJCCDD shall monitor (d) SJCCDD shall verify that <br /> retained trees shall be monitored for a period of five the retained and planted monitoring the retained and planted <br /> years following initial disturbance within the trees for five years after trees is done for five years after <br /> vicinity of a retained tree or following planting of a initial disturbance and, if initial disturbance and that trees are <br /> replacement tree. If,during the course of necessary,replace trees as replaced as described under(c), if <br /> monitoring,a significant decline in the health of described under(c). necessary. <br /> planted or retained trees is identified by a qualified <br /> arborist,the tree shall be replaced as described <br /> under(c). <br /> F.3.Implementation of the proposed project <br /> would,over the approximately 40-year project life, <br /> displace 80.5 acres of high quality foraging habitat <br /> (Brocchini property alfalfa field)and 133.4 acres of <br /> moderate quality foraging habitat(CYA and <br /> triangular properties)within a 10-mile radius of <br /> multiple State-listed Swainson's hawk nest sites <br /> (213.9 acre total),and would contribute to the <br /> cumulative loss of potential Swainson's hawk <br /> foraging habitat in San Joaquin County. <br /> (a) Under current project plans, approximately 10.3 (a) SJCCDD shall require (a) SJCCDD shall verify that a <br /> acres of the Brocchini property and the 6.5-acre that a habitat habitat mitigation/management <br /> triangular property would be retained as a Wildlife mitigation/management agreement is executed CDFG <br /> Preserve/Floodplain Easement. Proposed creek agreement be executed with before issuance of a construction <br /> modifications would also increase on-site creek CDFG before issuance of a permit of initiation of site <br /> acreage from 4.5 to 7.0 acres;thereby potentially construction permit of improvements,whichever occurs <br /> providing additional wildlife habitat(see Mitigation initiation of site first. <br /> Measure F.1). Additionally,the preliminary post- improvements,whichever <br /> closure maintenance plan states that,upon closure occurs first. <br /> of the landfill,the site would be capped, including <br /> revegetation with drought resistant grasses, <br />