Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE ' TIMING <br /> (a) To avoid impacting Sacramento splittail (a) SJCCDD shall require (a) SJCCDD shall monitor <br /> populations potentially present in Little Johns that work be scheduled and construction and verify that it is <br /> Creek, and to avoid impacts to other sensitive fish conducted as specified in the performed as specified in the <br /> species potentially present in this creek,work in the mitigation measure.,and mitigation measure.,and that any <br /> creek should only be conducted between July 31 require that any non-summer non-summer work is conducted in <br /> and September 30. If work must occur outside of work be conducted in accordance with NMFS <br /> these months,NMFS should be contacted.. Further accordance with NMFS recommendations. <br /> mitigation for non-summer work would be in recommendations. % <br /> accordance with recommendation provided by <br /> NMFS. Other mitigation could include conducting <br /> turbidity studies to determine if the work would be <br /> detrimental to Sacramento splittail. <br /> F.12. Implementation of the project could <br /> result in significant adverse impacts to giant garter <br /> snake. <br /> (a) Implementation of the approved wetland (a) SJCCDD shall require (a) SJCCDD shall verify that <br /> mitigation plan(see also Mitigation Measure F.1.) that incidental take permits incidental take permits are <br /> would compensate for impacts to aquatic and be acquired. acquired. <br /> associated habitat(which is assumed to constitute <br /> giant garter snake habitat)resulting from creek <br /> realignment. In accordance with that plan,a total of / <br /> 39 acres of aquatic and associated upland and <br /> riparian habitat shall be created,constituting a 4.5:1 <br /> replacement ratio,an shall be managed as a <br /> preserve for biological resources. <br /> (b) All mitigation requirements for giant garter (b) SJCCDD shall require (b) SJCCDD shall monitor <br /> snake should be in accordance with, and to the that all mitigation shall be construction and verify that all <br /> satisfaction of,CDFG and USFWS. Conditions conducted to the satisfaction mitigation is conducted to the <br /> attached to the CDFG Streambed Alteration of CDFG and USFWS. satisfaction of CDFG and USFWS <br /> Agreement shall be incorporated into the wetlands <br />