Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> plan and implemented accordingly, <br /> (c) The following pre-construction and (c) SJCCDD shall require (c) SJCCDD shall verify that <br /> construction measures should be implemented to that salvage measures as salvage measures are implemented. <br /> salvage individuals and to minimize and avoid take. specified in the mitigation <br /> These measures are consistent with the recently measure are conducted. <br /> released SJMSCP(Public Review Draft,September <br /> 23, 1999). <br /> * Construction shall occur during the active SJCCDD shall require that SJCCDD shall verify that <br /> period for the snake,between May I and construction be occur construction occurs between May I <br /> October 1. Between October 2nd and April between May I and October and October 1,or that additional <br /> 30th,the JPA with the concurrence of the I, or that additional mitigation measures are <br /> Permitting Agencies' representatives on the mitigation measures are implemented between October 2 <br /> TAC, shall determine if additional measures are implemented between and April 30 <br /> necessary to minimize and avoid take. October 2 and Apri130. <br /> • Limit vegetation clearing within 200 feet of the SJCCDD shall require that SJCCDD shall monitor construction <br /> banks of occupied giant garter snake aquatic vegetation clearing be and verify that vegetation clearing <br /> habitat to the minimal area necessary, limited as specified in the is limited as specified in the <br /> mitigation measure. mitigation measure <br /> • Confine the movement of heavy equipment SJCCDD shall require that SJCCDD shall monitor construction <br /> within 200 feet of the banks of occupied giant heavy equipment movement and verify that heavy equipment <br /> garter snake aquatic habitat to existing be limited as specified in the movement is limited as specified in <br /> roadways to minimize habitat disturbance. mitigation measure, the mitigation measure <br /> • Prior to ground disturbance,all on-site SJCCDD shall require that SJCCDD shall verify that , <br /> construction personal shall be given instruction construction personnel be construction personnel are <br /> regarding the presence of SJMSCP- covered instructed about sensitive instructed about sensitive species <br /> species and the importance of avoiding impacts species and their habitats. and their habitats <br /> to these species and their habitats. <br /> 29 <br />