Laserfiche WebLink
IMPACTIMITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> habitat on the project site would be <br /> delineated by a qualified ornithologist. <br /> Avoidance and mitigation would be <br /> pursuant to new guidelines provided by <br /> CDFG and/or as specified by the SJMSCP. <br /> (b) If the project sponsor elects not to - (b) See(a),above. (b) See(a),above. <br /> participate in the SJMSCP,then mitigation <br /> measures shall be implemented as noted <br /> below: <br /> Impacts to burrowing owl individuals or <br /> nest sites during the breeding season <br /> (February 1 to August 31)are considered <br /> ,"take" by CDFG. If there are construction <br /> activities proposed during the owl breeding <br /> season, and if burrowing owls are observed <br /> on or within 250 feet of the project site <br /> during pre-construction surveys,a 250-foot <br /> protective buffer would be established <br /> around the owls. The buffer would be <br /> protected by placement of a barrier <br /> (construction fence)that would remain in <br /> place for the duration of the breeding <br /> season. If the burrowing owl habitat would <br /> be implemented by the project,and it would, <br /> be necessary to relocate owls, a burrowing <br /> owl habitat mitigation plan would also be <br /> prepared and submitted to CDFG. A <br /> Mitigation Agreement(MA)that would <br /> legally bind the applicant to the conditions <br /> of the mitigation plan should be executed <br /> between CDFG and the applicant. <br /> 33 <br />