My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012793
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
EIR-99-2
>
SU0012793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 12:22:48 PM
Creation date
9/4/2019 10:03:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012793
PE
2675
FACILITY_NAME
EIR-99-2
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106005
ENTERED_DATE
1/6/2020 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR-99-2\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> IMPACTIMITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> sites should occur during dusk or evening after bats <br /> have left the sites unless otherwise approved. <br /> These measures are consistent with the SJMSCP. <br /> (c) Pre-construction surveys would prevent direct (b) See(a),above (b) See(a),above <br /> take of individuals or maternity sites. No <br /> immediate replacement of roosting habitat has been <br /> proposed. If a maternity roost or occupied roost is . <br /> detected during pre-construction surveys,the <br /> SJMSCP JPA shall provide adequate replacement <br /> for loss of occupied habitat should be designed and <br /> implemented with input from CDFG. <br /> Implementation of these mitigation measures would <br /> reduce impacts to levels considered less than <br /> significant. <br /> F.15. Implementation of the project could <br /> result in significant adverse impacts to burrowing <br /> owls if burrowing owls are present in the areas of <br /> suitable habitat. <br /> (a) The project sponsors or the SJMSCP (a) SJCCDD shall require (a) SJCCDD shall verify that <br /> JPA should fund and conduct pre- that protocol surveys be protocol surveys are conducted as ,1 <br /> construction protocol surveys for burrowing conducted as specified in the specified in the mitigation measure, <br /> owls in all ruderal and non-native grassland mitigation measure,and if and if burrowing owls are observed, <br /> habitats within the project site. Surveys burrowing owls are the avoidance and mitigation <br /> should be conducted as recommended in observed,the avoidance and measures identified in the <br /> the Staff Report on Burrowing Owl mitigation measures mitigation measure are <br /> Mitigation(CDFG 1995)and as otherwise identified in the mitigation implemented. <br /> prescribed in the Burrowing Owl Survey measure be implemented. <br /> Protocol and Mitigation Guidelines(BOC <br /> 1993). If burrowing owl are observed <br /> during surveys,the extent of burrowing owl <br />
The URL can be used to link to this page
Your browser does not support the video tag.