My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012793
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
EIR-99-2
>
SU0012793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 12:22:48 PM
Creation date
9/4/2019 10:03:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012793
PE
2675
FACILITY_NAME
EIR-99-2
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106005
ENTERED_DATE
1/6/2020 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR-99-2\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIGATI <br /> INIPACTIMITiGATION MEASURES IMPLEMENTATION MONITORING/REPORTINGOI �DVERIFICATION <br /> _ RESPONSIBILITY AND RE, <br /> TIMING/SCHEDULE TIMING <br /> in accordance with the SJMSCP,then the <br /> JPA may fund and conduct Pre- <br /> construction surveys to prevent direct take <br /> of individuals or nests. Pre-construction <br /> surveys should be conducted within 30 days <br /> prior to ground disturbance.These actions <br /> would reduce any significant adverse <br /> impacts to burrowing owl to a level <br /> considered less than significant. This <br /> mitigation option would also reduce <br /> impacts to this species habitat to a level <br /> considered less than significant by <br /> including pre-construction surveys in <br /> combination with payment of SJMSCP, ' <br /> fees. In addition,Methods to prevent <br /> occupation of the site by burrowing owls <br /> during construction should be employed, <br /> consistent with the guidelines in the <br /> SJMSCP. These methods include <br /> installation of one-way doors in occupied <br /> burrows,maintaining vegetation cover that <br /> discourages burrowing ground squirrels, <br /> disking to destroy burrows,or control of <br /> ground squirrel populations. <br /> G. ALR QUALITY <br /> G.1 Landfill equipment and earth moving <br /> activities on-site would generate fugitive dust. <br /> (a) Water the working face,excavation area; (a)LEA shall inform the (a) During site visits,LEA staff <br /> storage pile,unpaved roads, and all'unvegetated soil operator that he is to follow shall look for signs of dust that <br /> areas frequently,adding a dust palliative(a non- the watering directions could be attributable to the <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.