Laserfiche WebLink
TIGATI <br /> INIPACTIMITiGATION MEASURES IMPLEMENTATION MONITORING/REPORTINGOI �DVERIFICATION <br /> _ RESPONSIBILITY AND RE, <br /> TIMING/SCHEDULE TIMING <br /> in accordance with the SJMSCP,then the <br /> JPA may fund and conduct Pre- <br /> construction surveys to prevent direct take <br /> of individuals or nests. Pre-construction <br /> surveys should be conducted within 30 days <br /> prior to ground disturbance.These actions <br /> would reduce any significant adverse <br /> impacts to burrowing owl to a level <br /> considered less than significant. This <br /> mitigation option would also reduce <br /> impacts to this species habitat to a level <br /> considered less than significant by <br /> including pre-construction surveys in <br /> combination with payment of SJMSCP, ' <br /> fees. In addition,Methods to prevent <br /> occupation of the site by burrowing owls <br /> during construction should be employed, <br /> consistent with the guidelines in the <br /> SJMSCP. These methods include <br /> installation of one-way doors in occupied <br /> burrows,maintaining vegetation cover that <br /> discourages burrowing ground squirrels, <br /> disking to destroy burrows,or control of <br /> ground squirrel populations. <br /> G. ALR QUALITY <br /> G.1 Landfill equipment and earth moving <br /> activities on-site would generate fugitive dust. <br /> (a) Water the working face,excavation area; (a)LEA shall inform the (a) During site visits,LEA staff <br /> storage pile,unpaved roads, and all'unvegetated soil operator that he is to follow shall look for signs of dust that <br /> areas frequently,adding a dust palliative(a non- the watering directions could be attributable to the <br /> 35 <br />