Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> toxic chemical suppressant,such as magnesium included in Mitigation operation of the landfill and they <br /> chloride(MgC12)that attracts water molecules from Measure G.L(a). shall direct the operator to take <br /> the air),thereby keeping the surface wet for a corrective action as necessary. <br /> longer period. Regarding the watering of the <br /> working face,a balance must be made between dust <br /> control and the generation of additional leachate. <br /> The landfill operator shall monitor dust levels and <br /> levels of leachate generated to determine when and <br /> where water should be applied. <br /> (b) The project sponsor shall seek to minimize the (b)LEA shall direct the (b)During site visits,LEA staff <br /> extent of areas exposed to wind erosion. Exposed operator to minimize the shall look for signs of dust that <br /> surfaces,including stockpiles and other bulk extent of areas exposed to could be attributable to the <br /> materials with the potential to emit dust shall be wind erosion. Exposed operation of the landfill and they <br /> stabilized with the application of water,chemicals, surfaces, including shall direct the operator to take <br /> covered, or vegetated to the extent possible in stockpiles and other bulk corrective action as necessary. <br /> accordance with the SJVUAPCD's Regulation materials with the potential <br /> 8030. On windy days,when dust plumes are to emit dust shal l be <br /> present,active faces shall be watered down. stabilized with the <br /> application of water, <br /> chemicals,covered,or <br /> vegetated to the extent <br /> possible in accordance with CJ <br /> the SJVUAPCD's <br /> Regulation 8030. On windy <br /> days,when dust plumes are <br /> present,active faces shall be <br /> watered down. <br /> (c) Plan and phase construction and closure (c) LEA shall notify (c) During site visits,LEA staff <br /> operations such that they do not take place contractors and landfill shall monitor the work of the <br /> simultaneously on dry windy days. Schedule dusty operator to plan and phase contractors and landfill operator to <br /> activities on separate daysconstruction and closure help coordinate their <br />