Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORINGIREPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> amount of gas generated at the landfill. <br /> (a) The proposed landfill gas control system would (a)LEA/SJVUAPCD shall (a)LEAISJVUAPCD shall verify <br /> include a series of gas extraction wells and include in the landfill that the proposed landfill gas <br /> connectors,a gas condensate collection system and expansion plans a landfill control system is constructed as <br /> a gas blower/flare. The installation of a flare would gas control system which part of the landfill expansion <br /> require participation in the AB-2588 Air Toxics includes a series of gas project and that the state <br /> "Hot Spots"Information and Assessment Act under extraction wells and requirements for the installation of <br /> California Health and Safety Code Section 44325. connectors,a gas condensate the flare have been met and/or the <br /> The flare will not be required if the landfill gas is collection system and a gas landfill gas is recovered for electric <br /> recovered for electric power generation or other blower/flare. The power generation or otherenergy <br /> energy use. installation of a flare will use. . <br /> require participation in the <br /> AB-2588 Air Toxics"Hot <br /> Spots" Information and <br /> Assessment Act under . <br /> California Health and Safety <br /> Code Section 44325. The <br /> flare will not be required if <br /> the landfill gas is recovered <br /> for electric power generation OD <br /> or other energy use. <br /> GA Landfill wastes would generate toxic NIA <br /> air contaminants,which would have adverse health <br /> effects at nearby sensitive receptor locations/land <br /> use. No mitigation measure is warranted. <br /> G.5. Landfill wastes would generate <br /> objectionable odors. <br /> (a) The project includes the design and (a)Operator shall include in (a) LEA shall ensure that the design <br /> implementation of a landfill gas recovery or control the project design and and construction of the project <br /> 39 <br />