Laserfiche WebLink
F <br /> IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> system to ensure efficient destruction of odoriferous construction a landfill gas includes a landfill gas recovery or <br /> substances. recovery or control system control system. <br /> to ensure efficient <br /> destruction of odoriferous <br /> substances. <br /> (b) Excessively odorous wastes shall be (b)LEA shall direct the (b)LEAISJVUAPCD staff shall <br /> mixed immediately with other landfill wastes, operator to immediately mix monitor the odorous wastes at the <br /> depending on their nature and source. If diluting the odorous wastes with landfill to ensure that the operator is <br /> the intensity of odor is not sufficient,then the other landfill wastes, either diluting these wastes with <br /> operator shall immediately cover offensive depending on their nature other wastes and/or immediately <br /> materials as soon as they arrive at the landfill. and source. If diluting the covering the offensive materials as <br /> intensity of odor is not soon as they arrive at the landfill. <br /> sufficient,then the operator <br /> shall immediately cover <br /> offensive materials as soon <br /> as they arrive at the landfill. <br /> (c) The operator shall ensure that loading, (c) SJCCDD shall direct the (c)During site visits, SJCCDD staff <br /> unloading,and material handling activities are operator to load, unload,and shall verify that the operator is <br /> carried out efficiently and without delays to avoid handle materials efficiently loading, unloading,and handling <br /> excessive odors. and without delays to avoid materials efficiently and without ' <br /> excessive odors. delays to avoid excessive odors, <br /> (d) The operator shall apply daily cover (d) LEA shall direct the (d)During site visits, <br /> over odorous materials as soon as possible. operator to daily cover over LEA/SJVUAPCD shall verify that <br /> odorous materials as soon as the operator is applying daily cover <br /> possible. over odorous materials as soon as <br /> possible. <br /> G.6 The project by extending the number NIA <br /> of years the current number of vehicles travel to and <br /> from the site,would result in an increase in criteria <br /> air pollutant emissions. No mitigation measure is <br />