My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012793
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
EIR-99-2
>
SU0012793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 12:22:48 PM
Creation date
9/4/2019 10:03:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012793
PE
2675
FACILITY_NAME
EIR-99-2
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106005
ENTERED_DATE
1/6/2020 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR-99-2\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> period for settlement,in landfill and to maximize the <br /> order to take advantage of settlement period and that the latest <br /> anticipated improvements in technological advances are utilized. <br /> geosynthetic technology that <br /> would occur over the next <br /> 3 5 years. <br /> (b) The final design for the vertical expansion (b)The final design for the (b) SJCCDD, SJCPW-Solid Waste, <br /> would, if necessary,include additional components vertical expansion will and LEA shall verify that the <br /> in the liner system,depending on future differential provide for, if necessary,the construction plans for the final <br /> settlement on the liner system. inclusion of additional design for the vertical expansion <br /> components in the liner provides for, if necessary,the <br /> system,depending on future installation of additional <br /> differential settlement on the components in the liner system, <br /> liner system. depending on future differential <br /> settlement on the liner system. <br /> They shall verify that any necessary <br /> components are provided. <br /> (c) The extraction wells developed as part of the (c)Operator shall maintain (c)During site visits, LEA shall <br /> CAP shall be maintained and monitored during the extraction wells verify that the extraction wells <br /> Phases V and Vl,to be employed as needed for the developed as part of the developed as part of the CAP arc <br /> extraction of any residual contamination by CAP and these wells shall be being maintained. During Phases V <br /> leachate. monitored(with records of and VI,LEA shall review the <br /> results maintained by the monitoring reports and verify that <br /> SJCCDD)during Phases V these wells are employed when <br /> and VI and employed as needed for the extraction of any <br /> needed for the extraction of residual contamination by leachate. <br /> any residual contamination <br /> by leachate. <br /> (d) A review of the liner and leachate collection [(d)Operator shall submit to (d) SJCCDD, SJCDPW-Solid <br /> system for the vertical.expansion over the existing the appropriate responsible Waste,and LEA shall ensure that <br /> 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.