Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> period for settlement,in landfill and to maximize the <br /> order to take advantage of settlement period and that the latest <br /> anticipated improvements in technological advances are utilized. <br /> geosynthetic technology that <br /> would occur over the next <br /> 3 5 years. <br /> (b) The final design for the vertical expansion (b)The final design for the (b) SJCCDD, SJCPW-Solid Waste, <br /> would, if necessary,include additional components vertical expansion will and LEA shall verify that the <br /> in the liner system,depending on future differential provide for, if necessary,the construction plans for the final <br /> settlement on the liner system. inclusion of additional design for the vertical expansion <br /> components in the liner provides for, if necessary,the <br /> system,depending on future installation of additional <br /> differential settlement on the components in the liner system, <br /> liner system. depending on future differential <br /> settlement on the liner system. <br /> They shall verify that any necessary <br /> components are provided. <br /> (c) The extraction wells developed as part of the (c)Operator shall maintain (c)During site visits, LEA shall <br /> CAP shall be maintained and monitored during the extraction wells verify that the extraction wells <br /> Phases V and Vl,to be employed as needed for the developed as part of the developed as part of the CAP arc <br /> extraction of any residual contamination by CAP and these wells shall be being maintained. During Phases V <br /> leachate. monitored(with records of and VI,LEA shall review the <br /> results maintained by the monitoring reports and verify that <br /> SJCCDD)during Phases V these wells are employed when <br /> and VI and employed as needed for the extraction of any <br /> needed for the extraction of residual contamination by leachate. <br /> any residual contamination <br /> by leachate. <br /> (d) A review of the liner and leachate collection [(d)Operator shall submit to (d) SJCCDD, SJCDPW-Solid <br /> system for the vertical.expansion over the existing the appropriate responsible Waste,and LEA shall ensure that <br /> 50 <br />