Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> direct the operator to salvage economically feasible metallic <br /> all economically feasible discards. <br /> metallic discards. <br /> K.6. Project activities that increase <br /> leachate production from the existing landfill <br /> materials during various phases could alternatively <br /> facilitate the remediation of local groundwater,or <br /> result in groundwater contamination. <br /> (a) The extraction wells developed as part of the (a)Operator shall maintain (a)LEA staff shall monitor the <br /> CAP shall be maintained and monitored during the extraction wells extraction wells developed as part <br /> Phases V and VI,to be employed as needed for the developed as part of the of the CAP during Phases V and <br /> extraction of any residual contamination by CAP during Phases V and VI. <br /> leachate. VI. <br /> (b) The City of Stockton, San Joaquin County, (b) Parties shall meet prior (c)LEA shall monitor and assure <br /> RWQCB and IWMB should meet to determine if to implementation of that meeting occurs,and that any <br /> one or more of the existing landfill units should be expansion project. new requirements resulting from <br /> closed prior to approval of the expansion, the meeting are implemented. <br /> K.7. Surface and/or groundwater <br /> contamination could result if differential settlement <br /> damaged the liner and/or leachate collection system <br /> of the vertical expansion portion of the landfill <br /> (Phases V and VI). <br /> (a) Maximum preloaded settlement of the existing (a)Operator shall design the (a) SJCCDD and SJCPW-Flood <br /> landfill would provide the maximum period for expansion project to provide Control shall verify that the <br /> settlement,and would take advantage of anticipated the maximum preloaded construction plans for the expansion <br /> improvements in geosynthetic technology that settlement of the existing project provide a maximum <br /> would occur over the next 35 years. landfill and to maximize I preloaded settlement of the existing <br /> 49 <br />