My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011836
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-1800090
>
SU0011836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:35:38 AM
Creation date
9/4/2019 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011836
PE
2656
FACILITY_NAME
PA-1800090
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106003, -05, 18115007, -16
ENTERED_DATE
6/26/2018 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
8/15/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EHD COND.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\DRAFT SEIR-09-2018.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EIR-07-2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Supplemental Environmental Impact Report Page 1-2 ' <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • Increase the remaining landfill capacity by approximately 32.0 million cubic yards ' <br /> (cy) to approximately 54.0 million cubic yards(cy). All of the increase would be Class <br /> II landfill space and would extend the landfill closure date to approximately 20392. <br /> • Relocate approximately 3,000 feet of the South Fork of South Littlejohns Creek(which <br /> currently traverses the landfill) to the southeastern boundaries of the site to provide <br /> additional separation of the creek from the landfill. The relocated creek will be ap- <br /> proximately 3,200 feet in length. <br /> • Allow cannery waste processing in areas of site that are not being used for disposal at <br /> the time. <br /> The Board of Supervisors certified the Forward Landfill Expansion Final Environmental Im- <br /> pact Report however the project application required an override to the Airport Land Use <br /> Plan by the County Board of Supervisors,which was not approved. ' <br /> In 2014, Forward proposed a smaller increase in permitted landfilling capacity that did not <br /> include the previously proposed expansion of landfilling operations on the 184-acre Broc- <br /> chin parcel. This proposed increase in landfill acreage was entirely within the boundary of <br /> the 567-acres permitted under the current land use permit (UP-00-0007/ER-00-0002) ap- <br /> proved by the Board of Supervisors on April 8, 2003. A Draft Supplemental EIR(DSEIR) was ' <br /> circulated for this proposed expansion in December 2014 and comments were received, but <br /> Forward abandoned the project before the Final Supplemental EIR was completed. <br /> The 2018 Expansion Project described in this Supplemental EIR is very similar to the 2014 <br /> proposal. It has a smaller increase in permitted landfilling capacity than the 2013 project and <br /> does not include the any expansion of landfilling operations onto the Brocchini parcel. The <br /> additional proposed landfill acreage is entirely within the boundary of the 567-acres permit- <br /> ted under the current land use permit (UP-00-0007/ER-00-0002) approved by the Board of <br /> Supervisors on April 8,2003. <br /> The 2018 Expansion Project would make the following changes to the currently permitted <br /> landfill: <br /> • Landfilling of an 8.7-acre parcel in the northeast portion of the site within the cur- <br /> rently permitted landfill boundary. <br /> • Landfilling of approximately 8.6 acres in the south area <br /> • The south area expansion would require realigning about 2,900 feet of the South Fork ' <br /> of South Littlejohns Creek to a 3,300-foot alignment along the southern and eastern <br /> boundaries of the site, along with a new bridge across the creek. ' <br /> • The expansion would increase total landfill capacity by up to 8.12 million cubic yards <br /> beyond currently permitted levels, which would increase the remaining Class II land- <br /> I <br /> z The 2013 FEIR estimated closure dates with and without that project of 2039 and 2021,respectively. However,2014 estimated closure dates <br /> with and without the 2U3_EM project are 2045 and 2026,respectively. This is detailed in Section IILA in the <br /> Project Descrintim <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.