Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-3 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • Landfilling of approximately 8.6 acres in the south area <br /> • The south area expansion would require realigning about 2900 feet of the South <br /> Fork of South Littlejohns Creek to a 3300-foot alignment along the southern and <br /> eastern boundaries of the site,along with a new bridge across the creek. <br /> • The expansion would increase total landfill capacity by up to 8.1242 million cubic <br /> yards beyond currently permitted levels,which would increase the remaining Class <br /> II landfill capacity by approximately 8.12 million cubic yards (cy), from <br /> approximately 15.7 million cy currently permitted to approximately 245 million cy. <br /> • Landfill expansion would allow disposal at the landfill to continue until <br /> ' approximately 2036, a six-year increase from the current anticipated closure date of <br /> 2030. <br /> ' Site operations would remain mostly as described in the 2013 EIR.The complete 2018 <br /> Expansion Project, including the components that are unchanged, is described in <br /> Chapter II, Project Description, of this SEIR. <br /> Ir C. ENVIRONMENTAL IMPACTS <br /> Table S-1,below, summarizes the environmental impacts of the proposed project. <br />