Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page 11-4 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> Table S-1 <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> ENVIRONMENTAL MITIGATION MEASURE LEVEL OF <br /> IMPACT SIGNIFICANCE <br /> AFTER <br /> MITIGATION <br /> A. LAND USE, <br /> PLANS,AND <br /> POLICIES <br /> A.1. Compliance with No Impact. None required. No Impact <br /> County Plans and <br /> Policies. <br /> A.2. The proposed project No Impact. None required. No Impact <br /> would convert <br /> agricultural land to <br /> industrial use. <br /> Impact A.3. The proposed Proposed as part of the Project. Less t an <br /> project could exceed FAA Significant <br /> height limits for structures Forward would continue its procedure of submitting a Notice of Proposed <br /> near airports. Construction or Alteration(FAA Form 7460-1) at least 45 days prior to operation of <br /> any equipment that could temporarily intrude into the imaginary surface, as <br /> required by the Federal Aviation Administration(FAA)for all proposed <br />