Laserfiche WebLink
r r r �r rr r r rr rr r rr r r r r r rr i■r r <br /> Draft Supplemental Environmental Impact Report Page II-17 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> trackout. <br /> Enhanced and additional control measures for construction emissions of PM,o shall <br /> be implemented where feasible.These measures include: <br /> • Limit traffic speeds on unpaved roads to 15 mph by signage and electronic <br /> speed monitoring devices. <br /> • Install sandbags or other erosion control measures to prevent silt runoff to <br /> public roadways from sites with a slope greater than one percent. <br /> • Install wheel washers for all exiting trucks, or wash off all trucks and <br /> equipment leaving the site. <br /> • Install wind breaks at windward side(s) of construction areas. <br /> • Suspend excavation and grading activity when winds exceed 20 mph. <br /> • Limit area subject to excavation, grading, and other construction activity at <br /> any one time. <br /> The applicant shall implement feasible control measures during construction to <br /> mitigate NO,,and ROG emissions from construction equipment,which may <br /> include: <br /> • Require construction equipment used at the site to be equipped with <br /> catalysts/particulate traps,or Tier 4 diesel engines to reduce particulate <br /> emissions. Currently, CARB has verified a limited number of these devices <br /> for installation in several diesel engine families to reduce particulate <br /> emissions.At the time bids are made,contractors must show that the diesel- <br /> fueled construction equipment used is equipped with particulate filters <br /> catalysts,or Tier 4 diesel engines,or prove why it is infeasible. <br /> • Use alternative fueled construction equipment,where feasible. <br />