My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011836
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-1800090
>
SU0011836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:35:38 AM
Creation date
9/4/2019 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011836
PE
2656
FACILITY_NAME
PA-1800090
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106003, -05, 18115007, -16
ENTERED_DATE
6/26/2018 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
8/15/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EHD COND.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\DRAFT SEIR-09-2018.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EIR-07-2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r r r �r rr r r rr rr r rr r r r r r rr i■r r <br /> Draft Supplemental Environmental Impact Report Page II-17 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> trackout. <br /> Enhanced and additional control measures for construction emissions of PM,o shall <br /> be implemented where feasible.These measures include: <br /> • Limit traffic speeds on unpaved roads to 15 mph by signage and electronic <br /> speed monitoring devices. <br /> • Install sandbags or other erosion control measures to prevent silt runoff to <br /> public roadways from sites with a slope greater than one percent. <br /> • Install wheel washers for all exiting trucks, or wash off all trucks and <br /> equipment leaving the site. <br /> • Install wind breaks at windward side(s) of construction areas. <br /> • Suspend excavation and grading activity when winds exceed 20 mph. <br /> • Limit area subject to excavation, grading, and other construction activity at <br /> any one time. <br /> The applicant shall implement feasible control measures during construction to <br /> mitigate NO,,and ROG emissions from construction equipment,which may <br /> include: <br /> • Require construction equipment used at the site to be equipped with <br /> catalysts/particulate traps,or Tier 4 diesel engines to reduce particulate <br /> emissions. Currently, CARB has verified a limited number of these devices <br /> for installation in several diesel engine families to reduce particulate <br /> emissions.At the time bids are made,contractors must show that the diesel- <br /> fueled construction equipment used is equipped with particulate filters <br /> catalysts,or Tier 4 diesel engines,or prove why it is infeasible. <br /> • Use alternative fueled construction equipment,where feasible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.