Laserfiche WebLink
M me, M M M MM MM Mao M M M M M <br /> Draft Supplemental Environmental Impact Report Page II-23 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> decontamination water int e Class II surface impoundments. Upon <br /> approval in writing from the Regional Water Quality Control Board, <br /> containerized decontamination water will be discharged in the Class II <br /> surface impoundments. <br /> • For asbestos,a strict Asbestos-Containing Materials(ACM)handling <br /> program would be developed,and would include the following: <br /> a. Bagged ACM would be dumped only onto the working face of the <br /> asbestos disposal area and not onto the flat compacted landfill surface. <br /> Bulldozers would then push soil cover onto the working face to cover <br /> the ACM bags and will not contact the bags. <br /> b. For Forward site employees engaged in handling asbestos materials, <br /> Forward will implement one of the following: <br /> 1. A three-day approved asbestos workers training program <br /> 2. Any asbestos training program specific to landfill <br /> employees that has been developed, described,or <br /> required by regulation by either the CalRecycle or Cal- <br /> OSHA <br /> 3. Any other asbestos training program approved by Cal- <br /> OSHA <br /> c. Provision of water at the working face to keep ACM damp until <br /> covered. <br /> • Continuation of the annual physical evaluations of all onsite Forward <br /> employees for asbestos exposure. <br /> • Workers would not be allowed to eat near the active landfill. <br /> E.2. Hazardous waste Proposed as Part of the Project. Less than <br /> might inadvertently be Significant <br />