Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page 11-24 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> contained in the solid As part oft e project,the following procedures are proposed to reduce this impact: <br /> waste that is brought to . The Forward Landfill "load-checking program," which is designed to <br /> the landfill for disposal. mitigate against hazardous waste being placed in the landfill,will continue <br /> to be implemented for the consolidated landfill. <br /> • Landfill operators will be trained to recognize and properly segregate and <br /> handle hazardous waste. This will include a 24-hour hazardous-waste <br /> materials-management training program that complies with 29 CFR,Section <br /> 1910. <br /> E.3. Spills, collisions, Proposed as Part of the Project. Less than <br /> upsets, or other accidents . The Standard Safe Work Practices listed in the Forward,Inc.Site Health and Significant <br /> at the landfill or during Safety Program and Contingency Plan will be implemented by the operator. <br /> waste transport could <br /> cause injury to site • The landfill operator will comply with the provisions of CCR Title 27, <br /> workers,the general Section 20590,which requires that O&M personnel wear and use approved <br /> public, or the safety equipment for personal heath and safety. <br /> environment. • Landfill access will continue to be controlled to limit unauthorized entry by <br /> persons or vehicles. <br /> • The landfill operator will comply with all provisions of CCR,Title 27, <br /> Division 2, Chapter 3,Subchapter 4, Articles 1-3 that apply to landfill health <br /> and safety. <br /> Identified in This EIR: <br /> Mitigation Measure E.3. The San Joaquin County Public Works Department shall <br /> approve any new waste transport haul routes to the landfill from major arterials, <br /> SR 4,or Highway 99. <br /> EA. Additional landfill Proposed as Part of the Project. Less t an <br /> gas would be generated, Where required by State and Federal regulations, the landfill gas Significant <br /> thus increasing the monitoring, gas control and collection system will be installed,extending to <br /> �� ala i i r <br />