Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-26 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> landfill operations administrative file. <br /> E.6.The project would Identified in This EIR: Less than <br /> involve the use of Significant <br /> additional regulated or Mitigation Measure E.6: <br /> hazardous materials <br /> during the proposed (a)All applicable regulatory guidance originating after the Forward Landfill 2002 <br /> landfill expansion EIR shall be implemented;all hazardous materials shall be handled in accordance <br /> construction and with local,State, and federal regulations. <br /> operation. <br /> (b)The site HMMP,SWPPP,Operations Manual, and Wet Weather Plan shall serve <br /> to provide guidance in the use and handling of hazardous materials during the <br /> operations of the facility. <br /> E.7. Private groundwater Identified in This EIR: Less tfian <br /> production wells located Significant <br /> downgradient of the Mitigation Measure F.6, described under F. Hydrology and Water Quality,below, <br /> landfill may be affected by applies to this impact. <br /> the VOC-contaminated <br /> groundwater plume. <br /> E.B.Emissions of air toxics Less than Significant. None required. Less t an <br /> could pose a risk to Significant <br /> human health. <br /> F.HYDROLOGY AND <br /> WATER QUALITY, <br /> F.1. If rainfall runoff was Proposed as Part of the Project: Less t an <br /> 3 Note—In this SEIR's Hydrology and Water Quality Chapter,these impacts and mitigation measures are numbered"G.—"for document organizational purposes <br />