Laserfiche WebLink
rr �t r� �r r� �■r� rr r r� ■�r �rr rr rri r rr r� rr r�r r <br /> Draft Supplemental Environmental Impact Report Page II-25 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> potential for landfill gas the new areas oft e expanding landfill and operating in conformance with <br /> hazards. applicable regulations. <br /> • The existing gas extraction system, or an equivalent system,will continue to <br /> operate. <br /> • Regular gas monitoring will be conducted to prevent explosive or toxic gas <br /> accumulation in onsite buildings or beneath temporary buildings. The <br /> landfill operator will install an automatic combustible gas detection and <br /> alarm system for structures at the site. <br /> • The landfill operator will not construct or otherwise locate any structure in <br /> an area of known landfill gas build-up. <br /> • All site personnel who work in permanent structures will be trained to use <br /> and respond to the landfill gas monitoring and alarm system. <br /> Identified in This EIR: <br /> Mitigation Measure EA: Landfill gas monitoring shall include the volatile organic <br /> compounds in order to determine the amount of contaminant recovery, and control <br /> potential exposure to onsite personnel. <br /> E.5. Solid waste contains Proposed as Part of the Project. Less than <br /> pathogens that could . The landfill operator will follow legally required daily or alternative cover Significant <br /> spread by vectors. <br /> practices. <br /> • The landfill will continue to ban intact tires(which collect water and serve <br /> as a breeding ground for vectors) and large dead animals from disposal at <br /> the landfill. <br /> • Existing measures to discourage birds from the landfill will be continued. <br /> • Appropriate landfill personnel will periodically monitor the landfill for the <br /> presence of vectors, and landfill inspections will be documented in the <br />