The existing manure management system is adequate for the existing facilities and operations. <br /> necessary to accommodate this growth. <br /> The expansion of herd population at Phase I through Phase IV will require site improvements <br /> • Phase /— In phase one (fall 2003) install a state of the art milking parlor, a well, and two state <br /> of the art freestall barns to accommodate a population of 960 lactating cows. Replace the <br /> existing settling pond with a new settling pond and extend the lagoon. Install a manure solids <br /> storage area, and install a manure water irrigation system with drain ditches and return system <br /> designed to control all onsite water. <br /> • Phase //—(spring 2005) install two additional freestall barns and a well to bring lactating cow <br /> - population to 1310. Install a new settling pond. <br /> • Phase ///— (spring 2007) install two additional freestall barns to bring lactating cow population <br /> to 1665. <br /> • Phase /V— (spring 2008) install two additional freestall barns to bring lactating cow population <br /> to 1900. <br /> - The projected capacity required at this facility (based on a six month storage of manure effluent, <br /> milk parlor water and rainfall runoff) to ensure the maximum volume can be retained on site is <br /> 10,364,203 gallons (Phase 1), 13,595,590 gallons (Phase II); 17,034,478 gallons (Phase III); and <br /> adding the 3.4 inches from a 25 year 24 hour storm is 2,630i 105 A gallons (Phase 1), 3,212,889 B <br /> gallons (Phase 11), 3,555,172 B gallons (Phase III), resulting n a total volume of manure effluent to <br />— be 12,994,308 gallons (Phase 1), 16,808,479 gallons (Phase 11); and 20,589,650 gallons (Phase <br /> III). The projected capacities required for Phase IV, <br /> gallons 4,009,452 B gallons, and 19,177,162 gallons. based on 120 day storage c, are 15,167,710 <br /> CAPACITY LIMITS GALLONS <br /> Accumulation of ManurePhase I Phase If Phase III Phase IV <br /> Effluent and Rainfall Runoff <br /> 10,364,203 13,595,590 17,034,478 15,167,710 <br /> Rainfall Runoff 25 r./24 hr. 2,630,105 3,212,889 '3,555,172 4,009,452 <br /> Total Capacit Required 12,994,308 16,808,479 20,589,650 19,177,162 <br /> Settling Pond / Lagoon 20,619,164 23,755,198 23,755,198 23,755,198 <br /> Storage Capacity <br /> Notes: <br /> A. For Phase I, Capacity of lagoon is sufficient to retain all liquids. Settling pond will not be <br /> needed for winter rainfall storage. <br /> B. Capacity includes storage for one settling pond, in lieu of two ponds. The design of settling <br /> ponds is to retain the solids, and the liquids will overspill from one pond to the other; then to <br /> the flush lagoon. Therefore, both ponds will never be full simultaneously. Refer to Effluent <br /> Calculations, Appendix F. <br /> C. Note that Phase IV is calculated for 120 day storage of manure effluent, milk parlor water <br /> and rainfall runoff, as required by the State Water Quality Control Board. <br /> See Page 47 for References and Bibliography <br /> ®Western Dairy Design Associates, Inc. 2003 <br /> Page 2 <br />