Laserfiche WebLink
f u u <br /> Frank Coelho <br /> Page 2 <br /> As proposed in the work plan, a down hole video log of the existing domestic well <br /> must be performed to determine the proper method of destruction for the well. <br /> The well casing should be cleared of silt or other obstructions prior to the video <br /> log performance. <br /> I will be the PHS/EHD contact person for this site. Please contact me at (209) <br /> 468-3449 to schedule field work or if you have any questions. <br /> Donna Heran, RENS, Director <br /> Environmental Health Division <br /> Margaret Lagorio, Supervising REHS <br /> Site Mitigation Unit <br /> Enc. <br /> C: Ray Kablanow — Geological Technics <br /> Marty Hartzell - CVRWQCB <br />