Laserfiche WebLink
creek, to preclude the design (as defined by flood waters reaching elevation 297.1 feet in <br /> the channel created by the over crossing of Hospital Creek by lnterstate 580) from <br /> overtopping the levee system at a line 250 feet to the north of the northern boundary Of <br /> the CalTrans drainage easement for Hospital Creek. <br /> As appropriate, the long term (i.e., past ruining) maintenance of the levee system to the <br /> ' north a€ Hospital Ao <br /> pital Creek shall be under the control <br /> of an improvement zone,_an,. w <br /> part of the Count -wide " nigh is a <br /> >•-iqo _ <br /> Y d Control District a <br /> newly created County Service Area with <br /> the responsibility for maintaining the levee, or a newly created Reclamation District, <br /> which will be created prior to mining the northern mine area. <br /> 5.. HOSPiTAL CREEK SETBACK: Brightly colored pasts shall be installed every 50 feet <br /> along both sides of the Hospital Creek mining setback boundary area, which is measured <br /> 250 feet back from the centerline of the creek channel. Informational signs shall be. <br /> posted every 100 feet which identify fy thi s area as r <br /> sensitivity. Brightly color estricted due to its biological <br /> g y ed posts shall also be installed on each side <br /> both sides of the channel in the immediate vicinity of the Hospital Creek f the haul road on <br /> p turd. <br />'t t. SOIL <br /> RECONSTRUCTION PLAN: The reclaimed land surface shall be'no less than Z-2 <br /> fest above the nigh level of the water table. The final reclaimed upper five feat of <br /> matsnai shall consist of the€< < following: a minimurn fine soil Content of 30/ <br /> . a..aximum <br /> sand cntent of 20%. and a maximum gravel confer:# of 20°/a recorded on a <br /> Minimum of 90% of samnies taken at a depth of one to beneath the reclaimed surtace. <br /> The samples small also be tested for organic matter with a minimum refluirement of 1%, <br /> All recommendations of the Re-Soiling Reveaetation. and ;-rasion Cantrot Plan <br /> (contained as AopeRdix D of the =irsal EIR shall be enforced as aoprovriate dudno the <br /> life of the mine. <br /> U. SEISMIC SAFETY: if strong seismic shaking is experienced at the project site Jas the <br /> result of a moderate to large earthquake (M 6 or greater) along the CRSaBZ, ti-ie project <br /> site shall be inspected by a ^ualified licensed civil or geotechnical engineer to determine <br /> if liquefaction ar seismic subsidence has occurred and resulted in visible damage to <br /> reclaimed lands. A report, including recommendations to repair any damage that may <br /> have occurred. shall be submitted to the Development Services DiVtSign for review and <br /> apprpvai. Upon) aoprovai by the Department Services Division, the proponent shall <br /> implement the recommendations set forth 1-h the report. <br /> V. CULTURAL RESOURCES: The excavator shall cease all construction and excavation <br /> work immediately upon the discovery of cultural resource materials. Such work shall <br /> cease until the excavator has complied with the requirements of Appendix K of the <br /> C"-'QA Guidelines. <br /> W, E,jN`CRC2MENT: Except as otherwise provided in State Mining Reguiatiors, the <br /> County shall have authority to enforce provisions of the surface Mining and rReclarnatien <br /> Act. The County may exercise all enforcement regulations available under the County <br /> Development Title and the State Public Resources Code. Such enforcement measures <br /> include charging the applicant the costs of adminfs;ering an enforcement action. The <br /> l basis for charging fees for an enforcement action shall be a time and materials <br /> compensation, (Development Title Set7ilOn 9-1415.2rt1) <br />