Laserfiche WebLink
I w <br /> x• REPORT OF WAST: DISCHARGE: Submit a Report of Waste Discharge (RWD) to <br /> the Calffamia Regional Water Quality Control Board 130 days prior to the .start of any <br /> activity on the site. <br /> Y. INDEMNIFICATION: The.owner shall defende, indemnify, and hold harmless the local <br /> agency or its agents, officers, and employees from any claim, action, or proceeding <br /> against the local agency or its agents, officers, or employees to attack, set aside, void, or <br /> annul an approval of the local agency, advisory agency, appeal beard, or legislative <br /> body concerning this Quarry Excavation permit. <br /> Z, SCREENING: During the life of the project, two offset rows of almond trees shall be <br /> maintained around the perimeter of the excavation site. <br /> aa. SITE CLEANUP: Prior to the commencement of operations north of Hospital Creek, the <br /> existing .area being mined south of Hospital Creek shall be cleaned up. The cfeanup <br /> shall include the following; removal of spoils piles, formalize berms, provide uniform <br /> vegetative cover, and remove all obsolete, unused, and abandoned vehicles and alining <br /> equipment. ,s <br /> Z• DEPARTMENT OF PUBLIC WORKS: (Staf; Contac: Tomlwamiya, 468-3023) <br /> a. The ex avation pian shall be prpnared by a Registered Civil Engineer and in the <br /> - follawi;t= (Deve'sop.;f i r+�te Sewions -L�.3 and <br /> ( ) Dentail at ac,._ <br /> ss road (first 100 feet from wird Road shall be paved). <br /> (2) f=inal grading pian drainage provision. <br /> (3) Boundaries and quantities of excavation and direction of excavation for each <br /> phase. <br /> (4) Stockpile area'€or topsoil. <br /> b. Loads on Bird Road shall be restricted to legal leads only, (Streets and Highway Title <br />` Section 10-2350) <br /> f <br /> c. A video tape of road conditions on Bird Road, along the haul route, is required prior to <br /> the start of excavation. The condition of Bird Road shall be reviewed with the <br /> Department of Public Works prior to the start of excavation and every five years <br /> thereafter. (Development Title Section 9-1415.2) <br /> d. A Maintenance Agreement. along with a bond or cash deposit in the amount acceptable <br /> to the Department of Public W <br /> orks, steal! be required to ensure that if thepermittee fails, <br /> reyUsest <br /> arlsr.ruses, or neglects to repair, <br /> under permit, any damages to Bird Road that rr:ay result <br /> from permittae's operations, the Department of Public Works may do the worst necessary <br /> to restore Bird Road. from the project's entrance to the southern terminus of Teichert <br /> Aggregates' <br /> Bird Road reconstruction, equal to or better than its original condition, using <br /> { the Funds from said bond or cash <br /> deposit. su' <br /> le,= to review and <br /> adjustment for inflationeverY five spars. The Maintenance Agreement shall include a requirement <br /> that if at the <br />