Laserfiche WebLink
�q�Iy APPLICATION - QUARRY EXCAVATION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> ., FILE: NUMBER: QX- <br /> RECLAMATON PLAN <br /> CHECKLIST CONTINUED <br /> 1. Ore Processing: <br /> [X] 1. Describe the proposed method and equipment for processing are(e_g.,dry screening,flotation,leaching,etc.). <br /> G [X] 2.' Estimate minimum and maximum capacity(input and output)of the mill/processing facility. <br /> [X] 3. Provide the estimated life of the processing operation(if different from mine life). <br /> iJ. In-stream Kining: <br /> I <br /> [ ] 1. Describe methods that will be.used to protect water quality. <br /> j C l 2. Describe precautions that will be taken to.protect existing riparian vegetation. <br /> [ ] 3. Describe aquatic flora and fauna native to the are to be mined. <br /> [ ] 4. Provide evidence of contact with the State Department of Fish and Game regarding the need for a Stream Alteration <br /> Permit. <br /> [ ] K. Other Information: Include any other information requested by the lead agency to assess the environmental impacts of <br /> the proposed operation. <br /> III. DESCRIPTION OF PROPOSED RECLAMATION" <br /> A. Subsequent Use(s): <br /> [X] 1. What is the proposed subsequent use for the reclaimed mined land (e.g., recreation,wildlife habitat,grazing,open <br /> space,etc.) <br /> [X] 2. Evidence that owner(s)of a possessory interest(including surface rights)have been notified of the proposed use or <br /> potential uses after reclamation. <br /> ' [ ] 3. If the proposed end use is for a public purpose(e.g-,stormwater retention basin,ground water recharge basin,etc.), <br /> provide evidence that a public agency agrees to the need for the project and will assume responsibility for it upon <br /> completion. If a commitment cannot be obtained from a public agency,identify an alternative use and provide a <br /> plan for reclaiming the site for the alternate use. <br /> B. Reclamation Schedule: <br /> [X] 1. Provide a time schedule that will ensure reclamation at the earliest possible time on those portions of the mined <br /> lands that will not be subject to further disturbance. <br /> [X1 2. Provide a map of the proposed phases of reclamation and the corresponding acreage and dates for completion of <br /> each phase(see Reclamation Site Plan). <br /> [X] 3. If reclamation will not be concurrent with mining,explain why. <br /> C. Post Mining T000aranhv. <br /> I <br /> [X] 1" Provide a map of proposed post-reclamation topography;show drainage plan,benches, roads, plantings,and other <br /> I <br /> pertinent features of the reclamation(see Reclamation Site Plan). <br /> ► [X] 2. Attach cross sections through slopes,cuts,and fills;show original ground,post-mining surface, underlying geologic <br /> conditions,and reclaimed surface(see Reclamation Site Plan). <br /> i <br /> FADEMCTIanning Application Formal Page 10 of 18 <br /> Quarry Excavation.doc.(Revised o4-13-09) <br />