koA¢ul� k. APPLICATION --
<br /> �.
<br /> ° QUARRYEXCAVATI '
<br /> N:
<br /> SAN JOAQVIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT
<br /> c� p FILE NUMBER: QX-
<br /> RECLAMATIbIV PLAN
<br /> CHECKLIST-,CONTINUED
<br /> (X] 3. Describe how slopes will be stabilized to prevent failurestlandslides,earth flows,falling rock,and erosion. .
<br /> ( ] 4. Specify slope design calculations including the factor of safety.
<br /> ( ] D. Impoundments; Describe how impoundments will be reclaimed(e.g.,regraded,dewatered,capped, revegetated,
<br /> removed,etc.).
<br /> [X] E. Drainage: Describe provisions for natural drainage and how erosion of disturbed land and sedimentation will be
<br /> controlled during excavation and after final reclamation(e.g_,revegetation,rip rap,sedimentation basins,berms, ditches,
<br /> water bars,silt screens regrading, etc.).
<br /> (X] F. Disposition of Did Equipment: Discuss the disposition of equipment,buildings,structures,etc.
<br /> G. Revecietation:
<br /> [X] 1. Explain topsoil(or soil substitute)redistribution methods,including volumes of materials to be redistributed,
<br /> equipment and methods for transport, methods for preventing over compaction, and schedule for replacement. The
<br /> explanation may include:
<br /> [ ] a. the average thickness of replaced topsoil on the mine site;
<br />' [ 1 b. tests that will be run to determine whether soil or mine wastes need soil amendments to promote the support
<br /> plant growth'
<br /> [ ] c- methods to be used to protect redistributed topsoil (or soil substitute)from wind and water erosion before and
<br /> after seeding and planting.
<br /> { ] 2. Explain the types and amounts of fertilizers, mulch, soil stabilizers,lime,or other materials that will be used in
<br /> revegetation and indicate when they will be applied.
<br /> C l 3. Provide a planting(landscape) plan. The plan may include:
<br /> [ ] a. how the site will be prepared for planting(e.g., ripping,disking,and incorporation of soil additives),
<br /> [ ] b. a list of the species(include scientific names)to be planted,
<br /> ( ] c. the type of plant material to be used(e.g., seeds,cuttings,container, plugs),
<br /> C l d. the density or rate of planting(e.g.,poundslacre,cuttings on 5 foot centers,etc.),
<br /> [ ] e. a revegetation=map indicating species and location.
<br /> [ ] 4. Describe what planting method(s)will be used(e.g.,hydroseeding,by d planting, seed drill,etc.).
<br /> [ ] 5. Discuss when(during which month(s))planting will take place and the relationship between timing and the success
<br /> of the revegetation plan.
<br /> [ ] 6. Describe how the plants will be protected from predation and disturbance(e.g.,fencing,signs,etc.).
<br /> 7_ Irrigation: If irrigation is proposed,then discuss:
<br /> [ l a. the kind of irrigation system that will be used to water the plants;
<br /> [ l b. the water source and the water quality.of that source;.
<br /> FMEVSMPlanning Application Formsk Page 11 of 18
<br /> Quarry Excavation.doe.(Revised 04-13-09)
<br />
|