Laserfiche WebLink
koA¢ul� k. APPLICATION -- <br /> �. <br /> ° QUARRYEXCAVATI ' <br /> N: <br /> SAN JOAQVIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> c� p FILE NUMBER: QX- <br /> RECLAMATIbIV PLAN <br /> CHECKLIST-,CONTINUED <br /> (X] 3. Describe how slopes will be stabilized to prevent failurestlandslides,earth flows,falling rock,and erosion. . <br /> ( ] 4. Specify slope design calculations including the factor of safety. <br /> ( ] D. Impoundments; Describe how impoundments will be reclaimed(e.g.,regraded,dewatered,capped, revegetated, <br /> removed,etc.). <br /> [X] E. Drainage: Describe provisions for natural drainage and how erosion of disturbed land and sedimentation will be <br /> controlled during excavation and after final reclamation(e.g_,revegetation,rip rap,sedimentation basins,berms, ditches, <br /> water bars,silt screens regrading, etc.). <br /> (X] F. Disposition of Did Equipment: Discuss the disposition of equipment,buildings,structures,etc. <br /> G. Revecietation: <br /> [X] 1. Explain topsoil(or soil substitute)redistribution methods,including volumes of materials to be redistributed, <br /> equipment and methods for transport, methods for preventing over compaction, and schedule for replacement. The <br /> explanation may include: <br /> [ ] a. the average thickness of replaced topsoil on the mine site; <br />' [ 1 b. tests that will be run to determine whether soil or mine wastes need soil amendments to promote the support <br /> plant growth' <br /> [ ] c- methods to be used to protect redistributed topsoil (or soil substitute)from wind and water erosion before and <br /> after seeding and planting. <br /> { ] 2. Explain the types and amounts of fertilizers, mulch, soil stabilizers,lime,or other materials that will be used in <br /> revegetation and indicate when they will be applied. <br /> C l 3. Provide a planting(landscape) plan. The plan may include: <br /> [ ] a. how the site will be prepared for planting(e.g., ripping,disking,and incorporation of soil additives), <br /> [ ] b. a list of the species(include scientific names)to be planted, <br /> ( ] c. the type of plant material to be used(e.g., seeds,cuttings,container, plugs), <br /> C l d. the density or rate of planting(e.g.,poundslacre,cuttings on 5 foot centers,etc.), <br /> [ ] e. a revegetation=map indicating species and location. <br /> [ ] 4. Describe what planting method(s)will be used(e.g.,hydroseeding,by d planting, seed drill,etc.). <br /> [ ] 5. Discuss when(during which month(s))planting will take place and the relationship between timing and the success <br /> of the revegetation plan. <br /> [ ] 6. Describe how the plants will be protected from predation and disturbance(e.g.,fencing,signs,etc.). <br /> 7_ Irrigation: If irrigation is proposed,then discuss: <br /> [ l a. the kind of irrigation system that will be used to water the plants; <br /> [ l b. the water source and the water quality.of that source;. <br /> FMEVSMPlanning Application Formsk Page 11 of 18 <br /> Quarry Excavation.doe.(Revised 04-13-09) <br />