My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008137
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BOULTON
>
401
>
2600 - Land Use Program
>
PA-1000043
>
SU0008137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:22 AM
Creation date
9/4/2019 10:31:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008137
PE
2605
FACILITY_NAME
PA-1000043
STREET_NUMBER
401
Direction
S
STREET_NAME
BOULTON
STREET_TYPE
RD
City
STOCKTON
APN
13103011
ENTERED_DATE
3/8/2010 12:00:00 AM
SITE_LOCATION
401 S BOULTON RD
RECEIVED_DATE
3/5/2010 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BOULTON\401\PA-1000043\SU0008137\APPL.PDF \MIGRATIONS\B\BOULTON\401\PA-1000043\SU0008137\CDD OK.PDF \MIGRATIONS\B\BOULTON\401\PA-1000043\SU0008137\EH COND.PDF \MIGRATIONS\B\BOULTON\401\PA-1000043\SU0008137\REV SITE PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L , <br /> a { APPLICATION. QUARRY EXCAVATION <br /> SAN JOAQUIN COUNTY COMMIJNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: QX <br /> REC 'AM 'TION PLAT <br /> CI3 ( CL[ST,Cokiiw.6 <br /> [ ] c. how often(e.g., biweekly)and at what rate(e.g.,1/4 inch/session)the area will be irrigated; <br /> [ ] d. how long the site will continue to be irrigated. <br /> [ ] 8. Describe how test plots will be used to evaluate the effectiveness of the proposed revegetation plan. Discuss how <br /> the lead agency will be notified of changes made in the revegetation plan based on the success of the test plots and <br /> practical experience. <br /> H. Monitoring and Maintenance: <br /> [ ] 1. Describe the monitoring and maintenance program that will be instituted to ensure that the proposed reclamation is <br /> successful and is maintained_ <br /> [ ] 2, Describe or cite the standards to be used to determine success of revegetation,erosion control treatments, and <br /> public safety measures. <br /> [ ] 3. Who will be responsible for carrying out the maintenance and monitoring program? <br /> [ ] 4. Discuss what action will be taken if the initial reclamation efforts are unsuccessful. <br /> I. In-stream Mining: <br /> [X] 1. Describe the manner in which reclamation of the affected streambed channels and streambanks to a condition <br /> minimizing erosion and sedimentation will occur, <br /> [ ] .2. Provide an annual monitoring plan(using aerial photos or cross sections)to assess impacts of mining or premining <br /> channel conditions. <br /> [X] J. Future Mining: Explain how the proposed reclamation of this site will affect the potential for future mining at the site. <br /> [X] K. Public Safety: What measures will be takers to ensure public safety(e.g.,fences,gates,slopes,signs,or hazard <br /> removal)? How will the safety measures be maintained? <br /> [ ] L. Other Information: Include any other information requested by the lead agency to ensure that adverse environmental <br /> are prevented or minimized and that ithe mined lands are reclaimed to a useable condition which is readily adaptable for <br /> alternative land uses. <br /> I <br /> I <br /> I <br /> pgnA 17 of 18 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.