Laserfiche WebLink
a , <br /> i <br /> f. The maximum depth to be 8.2 feet, the bench that runs parallel along the two <br /> sloughs in field# 1 will be 200 feet in width running south to north and this <br /> area will not be excavated and will remain in its native state. The remainder <br /> of field # 1 will be average of 1130 feet across. Field# 2 will also have the <br /> 200 feet set back from the toe of the levee and be 4:35 feet across. All slopes <br /> will be at a 3:1 grade. <br /> g. There will be no phases for thisproject although field no.2 will remain in <br /> farming production until main field is excavated <br /> D. SIZE: <br /> 1. The total area for this ranch is 128 acres with the project site covering 33.8 <br /> Acres. <br /> 2. The total acreage to be disturbed is 33.8 acres. <br /> 3. The total acreage to be reclaimed is 33.8 acres. <br /> E. WATER REQUIREMENTS: <br /> 1. Upon prior experience of other excavations from this general area and the soil <br /> type with the short haul road only 3,500 to 7,000 gallons on a daily basis is <br /> needed during the summer and little or no water during the winter months and <br /> 3500 gallons daily during the spring and fall months although some days water <br /> may not be needed. <br /> f 2. On a yearly basis between 680,000 to 780,000 gallons may be needed. <br /> F. CONTAMINANTS: <br /> 1. There.will be::no domestic garage,_but if-small amount.every two months it <br /> ,can-be taken'°home and placed-in domestic garbage.No-chemicals except <br /> for diesel fuel and motor oil. Equipment is maintained by a professional <br /> service company that takes old oils, filters, etc from quarry site as part of <br /> service requirement. The 1000 gallon diesel tank to be placed in a metal <br /> self containment box. <br /> l <br /> 4 <br />