My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012821
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
13751
>
2600 - Land Use Program
>
SU-91-15
>
SU0012821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 5:16:09 PM
Creation date
9/4/2019 10:36:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012821
PE
2611
FACILITY_NAME
SU-91-15
STREET_NUMBER
13751
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237-
APN
01906029
ENTERED_DATE
1/9/2020 12:00:00 AM
SITE_LOCATION
13751 E BRANDT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BRANDT\13751\SU-91-15\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> SU-91-15 � <br /> i <br /> C. Si nificarrt lmnact: Cumulative traffic impacts. <br /> i <br /> Project traffic, when outesedto 1 88 through e'conditions (year 2010), -would result in Lockeford from Brandt Ro d to Tully Road,LOS 1JF i <br /> operations on State R <br /> i <br /> " Findin 'K i <br /> Specific economic, social, or other considerations make infeasible any mitigation measures or <br /> � <br /> project alternatives identified in the Final EIR. <br /> Statement of Fact: <br /> Existing plus project, plus known cumulative projects, do not yield a change in traffic conditions j <br /> and do not degrade traffic conditions to unacceptable levels, The State Route is a regional <br /> facility,and the long-term cumulative traffic impacts are regional concerns which will be addressed <br /> on a regional basis. Long-term effects will be studied and resolved in <br /> nne icahvehicles as ces, andresulting hi <br /> General Pian process, engineering studies funded subthe <br /> ct to the payment of the County's Traffic 1 <br /> mitigation fees. Additionally, the project is already l <br /> ide mitigation for these cumulative traffic impacts to <br /> Impact Mitigation Fees. In an effort to prov , <br /> the extent that is practicable, the developer will contribute his 'fair share' of fees.toward future l f <br /> roadway improvements in the Lockeford area. 11 <br /> . s <br /> -9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.